This report presents a detailed summary, by municipality, of the sanitary sewer collection and treatment facilities in operation in Somerset County at the time. It supplements regional plans, pinpoints the areas of greatest need, and provides basic data for evaluating future sewer programs. It contains descriptions of the Somerset-Raritan Valley Sewerage Authority's facilities, the Middlesex County Sewerage Authority's facilities, and the Plainfield Joint Meeting Sewer System.Purpose: To present a summary of sewage treatment facilities in operation in Somerset County
This report presents potential water resources for Sussex County, makes population projections for f...
This is a joint environmental engineering report prepared as a step in the planning of regional sewa...
This project report has developed preliminary designs of sanitary sewerage facilities necessary to c...
This study of Regional Sewerage Facilities for the Tri-County area has been limited to those portion...
This report inventories major private, municipal, and regional sewerage systems serving the Middlese...
A report detailing regional sewerage facilities for the tri-county area consisting of Hunterdon, Mor...
This report presents a plan for the addition of new sewage facilities at the Central Treatment Plant...
This report presents the basic data used in the development of the Master Plan for Wastewater Manage...
This report briefly discusses recommendations regarding the formation and implementation of the Rock...
This report studies the future expected growth in the Somerset Raritan Valley Sewerage Authority's a...
Facilities planning report for the project to replace a five MGD secondary treatment and outfall fac...
The purpose of this Study is to develop feasible alternative solutions to provide adequate sewerage ...
This engineer's report, prepared for the township of Parsippany-Troy Hills, contains detailed plans ...
This report presents a master plan for the consolidation of sewerage facilities in the Bayshore Regi...
Preliminary Report on plans for the collection and treatment of wastes from the Manasquan River Regi...
This report presents potential water resources for Sussex County, makes population projections for f...
This is a joint environmental engineering report prepared as a step in the planning of regional sewa...
This project report has developed preliminary designs of sanitary sewerage facilities necessary to c...
This study of Regional Sewerage Facilities for the Tri-County area has been limited to those portion...
This report inventories major private, municipal, and regional sewerage systems serving the Middlese...
A report detailing regional sewerage facilities for the tri-county area consisting of Hunterdon, Mor...
This report presents a plan for the addition of new sewage facilities at the Central Treatment Plant...
This report presents the basic data used in the development of the Master Plan for Wastewater Manage...
This report briefly discusses recommendations regarding the formation and implementation of the Rock...
This report studies the future expected growth in the Somerset Raritan Valley Sewerage Authority's a...
Facilities planning report for the project to replace a five MGD secondary treatment and outfall fac...
The purpose of this Study is to develop feasible alternative solutions to provide adequate sewerage ...
This engineer's report, prepared for the township of Parsippany-Troy Hills, contains detailed plans ...
This report presents a master plan for the consolidation of sewerage facilities in the Bayshore Regi...
Preliminary Report on plans for the collection and treatment of wastes from the Manasquan River Regi...
This report presents potential water resources for Sussex County, makes population projections for f...
This is a joint environmental engineering report prepared as a step in the planning of regional sewa...
This project report has developed preliminary designs of sanitary sewerage facilities necessary to c...