Railroad Bridge Construction Projects have frequently exceeded their cost and schedule resulting in major financial losses to the owners and to the contractors, severe interruption of the rail operation schedules and consequently significant inconvenience to the rail commuters. Currently, there are very few methods available to predict the completed construction cost. This research proposes cost estimating model that incorporates the “major uncertainty constraints” (MUC) which drive both the cost and schedule of Railroad bridge Construction. This approach is an advanced unique model that is proposed for calculation of adequate contingency in a portfolio of construction projects. It is used to update historical contingency values based on ...
Abstract: This research article presents the development process of a cost-estimating model for rail...
Accurate client budget estimates are critical to the initial decision-to-build process for the highw...
Conceptual cost estimating is typically completed early in the project lifecycle when little design ...
Thesis (Ph. D.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering...
Cost overruns and delays in infrastructure projects are not a recent problem. They have systematical...
The amount of risk in mega infrastructure projects (MIPs) has undoubtedly contributed to the rising ...
Accurate owner budget estimates are critical to the initial decision-to-build process for highway co...
Researchers and engineers worldwide continue to ponder over the reliability of construction cost for...
© 2014 American Society of Civil Engineers. The determination of a project's cost contingency is a p...
Preliminary cost estimates rely on the conceptual design of the project and use only basic design te...
This research identified significant factors that may influence, or serve as indicators of, potentia...
During the construction phase, significant differences between the planned and actual costs of const...
Cost overrun in any sector brings bad image to the organization and unrest to the professionals. The...
© 2016 Elsevier LtdUnderstanding the cause of cost overruns in transportation infrastructure project...
Studies have shown that mega transportation infrastructure projects underperform when actual cost an...
Abstract: This research article presents the development process of a cost-estimating model for rail...
Accurate client budget estimates are critical to the initial decision-to-build process for the highw...
Conceptual cost estimating is typically completed early in the project lifecycle when little design ...
Thesis (Ph. D.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering...
Cost overruns and delays in infrastructure projects are not a recent problem. They have systematical...
The amount of risk in mega infrastructure projects (MIPs) has undoubtedly contributed to the rising ...
Accurate owner budget estimates are critical to the initial decision-to-build process for highway co...
Researchers and engineers worldwide continue to ponder over the reliability of construction cost for...
© 2014 American Society of Civil Engineers. The determination of a project's cost contingency is a p...
Preliminary cost estimates rely on the conceptual design of the project and use only basic design te...
This research identified significant factors that may influence, or serve as indicators of, potentia...
During the construction phase, significant differences between the planned and actual costs of const...
Cost overrun in any sector brings bad image to the organization and unrest to the professionals. The...
© 2016 Elsevier LtdUnderstanding the cause of cost overruns in transportation infrastructure project...
Studies have shown that mega transportation infrastructure projects underperform when actual cost an...
Abstract: This research article presents the development process of a cost-estimating model for rail...
Accurate client budget estimates are critical to the initial decision-to-build process for the highw...
Conceptual cost estimating is typically completed early in the project lifecycle when little design ...