The deminer was conducting manual clearance utilising full excavation drills. At 09:15 he was excavating the front right comer of his lane he initiated what is believed to be a V550
He had excavated approximately 15 cms towards the initial signal and 5 cms in depth when he came to ...
The mine accident happened at 10:00 hrs on the 3rd July 2001 while the [Demining group] were conduct...
At 0915hrs on 14 Oct 06 whilst conducting clearance using the [International demining NGO] standard ...
On the day of the accident a [1st commercial demining group] Deminer was conducting manual clearance...
On 18th Apr 2002 one of our deminers activated a small AP mine while he was excavating the ground. T...
At 09.10hrs on the 22nd of September 2004, deminer [the Victim] was carrying out manual clearance us...
The demining team had been working at the site since February. The Victim was working in a breaching...
The victim prodded onto a mine at 07:55. There was a 45cm gap between the accident site and the rec...
The incident happened while the deminer trying to investigate a signal using the heavy RAKE. The dem...
The investigators determined that the deminer was excavating to investigate a detector reading whe...
The deminer was working within the Site Preparation Stage to identify the centre of the mine line an...
The investigators determined that the victim used his detector over the two meter clearance lane he ...
The deminer was clearing a lane of the minefield (69270024) when he initiated a mine with his Heavy ...
The Team leader was preparing to destroy the discovered mines when he was injured in the first mine ...
As he excavated closer to the position of the signal he stopped and swept again with the detector. A...
He had excavated approximately 15 cms towards the initial signal and 5 cms in depth when he came to ...
The mine accident happened at 10:00 hrs on the 3rd July 2001 while the [Demining group] were conduct...
At 0915hrs on 14 Oct 06 whilst conducting clearance using the [International demining NGO] standard ...
On the day of the accident a [1st commercial demining group] Deminer was conducting manual clearance...
On 18th Apr 2002 one of our deminers activated a small AP mine while he was excavating the ground. T...
At 09.10hrs on the 22nd of September 2004, deminer [the Victim] was carrying out manual clearance us...
The demining team had been working at the site since February. The Victim was working in a breaching...
The victim prodded onto a mine at 07:55. There was a 45cm gap between the accident site and the rec...
The incident happened while the deminer trying to investigate a signal using the heavy RAKE. The dem...
The investigators determined that the deminer was excavating to investigate a detector reading whe...
The deminer was working within the Site Preparation Stage to identify the centre of the mine line an...
The investigators determined that the victim used his detector over the two meter clearance lane he ...
The deminer was clearing a lane of the minefield (69270024) when he initiated a mine with his Heavy ...
The Team leader was preparing to destroy the discovered mines when he was injured in the first mine ...
As he excavated closer to the position of the signal he stopped and swept again with the detector. A...
He had excavated approximately 15 cms towards the initial signal and 5 cms in depth when he came to ...
The mine accident happened at 10:00 hrs on the 3rd July 2001 while the [Demining group] were conduct...
At 0915hrs on 14 Oct 06 whilst conducting clearance using the [International demining NGO] standard ...