The accident occurred near a high voltage pylon to the south of Moamba town and approximately 22 km from the demining group’s camp. The pylon was mined during the armed conflict and a barbed wire fence was put up to prevent the entry of people and animals. Outside this fence were other mines of the PMN, PMN-2 and PMD-6 types
When the deminer came alongside the first mine, he located another, and called the victim again. The...
The investigators determined that the victim was pulling a wire obstacle out of the way when he acci...
The demining group were clearing the Zimbabwe/Mozambique border minefields. The detector used was a ...
The soil was rocky, highly metallic and with dense vegetation, but still he carried on working only ...
The victim was working as a deminer in a lane where “mechanical demining” had taken place. He detona...
The accident occurred while carrying out a Survey Level 2 at Save minefield and the first deminer wa...
At 09.15 three deminers were injured when a mine detonated while being handled outside the mined are...
Despite the absence of a paramedic, [the Victim] who has the position of Team Leader in the organisa...
There was a safe lane at the bottom of the embankment and deminers were working uphill from it. The ...
The accident occurred in a defensive ring of mines laid during 1987. The ring formed part of the pro...
Work began on 18th May 1995 and one side was cleared that day, with a POMZ-2 located and destroyed. ...
On the day of the accident the demining group\u27s ex-pat country Manager went in to investigate the...
An investigation was made by the Deputy Director of the National MA authority and a UN QA officer. T...
The demining platoon had cleared 5,1602 metres and eight mines at Homoine before the accident . The...
Saturday, 7 May 2005, at 10:20 a.m. local time, [Demining group] suffered a mine accident in the man...
When the deminer came alongside the first mine, he located another, and called the victim again. The...
The investigators determined that the victim was pulling a wire obstacle out of the way when he acci...
The demining group were clearing the Zimbabwe/Mozambique border minefields. The detector used was a ...
The soil was rocky, highly metallic and with dense vegetation, but still he carried on working only ...
The victim was working as a deminer in a lane where “mechanical demining” had taken place. He detona...
The accident occurred while carrying out a Survey Level 2 at Save minefield and the first deminer wa...
At 09.15 three deminers were injured when a mine detonated while being handled outside the mined are...
Despite the absence of a paramedic, [the Victim] who has the position of Team Leader in the organisa...
There was a safe lane at the bottom of the embankment and deminers were working uphill from it. The ...
The accident occurred in a defensive ring of mines laid during 1987. The ring formed part of the pro...
Work began on 18th May 1995 and one side was cleared that day, with a POMZ-2 located and destroyed. ...
On the day of the accident the demining group\u27s ex-pat country Manager went in to investigate the...
An investigation was made by the Deputy Director of the National MA authority and a UN QA officer. T...
The demining platoon had cleared 5,1602 metres and eight mines at Homoine before the accident . The...
Saturday, 7 May 2005, at 10:20 a.m. local time, [Demining group] suffered a mine accident in the man...
When the deminer came alongside the first mine, he located another, and called the victim again. The...
The investigators determined that the victim was pulling a wire obstacle out of the way when he acci...
The demining group were clearing the Zimbabwe/Mozambique border minefields. The detector used was a ...