The mined area was laid by the District Police and Militia to protect a dyke from attack. The reconnaissance team warned of booby trapped 60mm mortars and B40 RPGs. At 13:45 on the day of the accident Victim No.1 located a device similar to one that had been found two hours before. He called his Section Commander to identify it. The Section Commander, Victim No.2, arrived and stood to his right behind him. The Section Commander removed his safety spectacles to wipe sweat from his eyes and get a better view. Victim No.1 began to probe again and Victim No.2 told him to stop. As he put the tool down, the device exploded. Both victims fell back into a cleared area
The victim was a detector man for his platoon and was working in his lane when at 10:57 the site man...
They were working very slowly and had only cleared 15m2 by 14:00. He had checked the area ahead of t...
The investigators determined that he detected a reading and put his helmet on to prod. He could find...
At 12:45 he initiated a mine with his detector, causing him to stagger backwards and collapse about ...
The demining team were clearing land so that an NGO could build a road. There was a deserted house a...
At the time of the accident, Victim No.1 was excavating a detector reading. Victim No.2 was the dete...
The accident occurred at a site with laterite contaminated soil and several strong signals were fo...
The victim stated that he was aware that he had breached SOPs by carrying the fuse out of the mined ...
Victim No,1 was working with Victim No.2 to his right when he saw a bush with a pile of PMN-2 mines ...
The demining pair were clearing a lane as a team with one doing the detection and the other clearing...
Signed by an expatriate specialist and dated 5th September 1998, the report stated that demining had...
Referring to demining sequence, deminer no. 1 conducted vegetation removal drill (skipped tripwire d...
The victim was a prodder man and he and his partner had already cleared about 20m and had found abou...
The investigators decided that the victim was working with a detector beside a stream when he got a ...
The investigators determined that the ditch had contained many mines thought to have been brought in...
The victim was a detector man for his platoon and was working in his lane when at 10:57 the site man...
They were working very slowly and had only cleared 15m2 by 14:00. He had checked the area ahead of t...
The investigators determined that he detected a reading and put his helmet on to prod. He could find...
At 12:45 he initiated a mine with his detector, causing him to stagger backwards and collapse about ...
The demining team were clearing land so that an NGO could build a road. There was a deserted house a...
At the time of the accident, Victim No.1 was excavating a detector reading. Victim No.2 was the dete...
The accident occurred at a site with laterite contaminated soil and several strong signals were fo...
The victim stated that he was aware that he had breached SOPs by carrying the fuse out of the mined ...
Victim No,1 was working with Victim No.2 to his right when he saw a bush with a pile of PMN-2 mines ...
The demining pair were clearing a lane as a team with one doing the detection and the other clearing...
Signed by an expatriate specialist and dated 5th September 1998, the report stated that demining had...
Referring to demining sequence, deminer no. 1 conducted vegetation removal drill (skipped tripwire d...
The victim was a prodder man and he and his partner had already cleared about 20m and had found abou...
The investigators decided that the victim was working with a detector beside a stream when he got a ...
The investigators determined that the ditch had contained many mines thought to have been brought in...
The victim was a detector man for his platoon and was working in his lane when at 10:57 the site man...
They were working very slowly and had only cleared 15m2 by 14:00. He had checked the area ahead of t...
The investigators determined that he detected a reading and put his helmet on to prod. He could find...