They were working very slowly and had only cleared 15m2 by 14:00. He had checked the area ahead of the lane for tripwires, then cut the grass. The third deminer then went to rest and Victim No.2 checked the area with the detector and marked three places. Victim No.1 then went forward to prod the marked places. He prodded on one but could find nothing so called Victim No.2 forward to show him exactly where the detector had signalled. Victim No.2 did so and as he walked back he stepped on the mine at 14:05. Victim No.2\u27s left leg was bleeding and his foot blown off. Victim No.1 suffered blast bruises on his face . The extent of damage to his eyes was unclear
The victim was the vegetation cutter and prodder man. He cleared 50cm of vegetation at the end of th...
The two victims were walking through a cleared area to the rest area at the completion of their day...
The demining pair were clearing a lane as a team with one doing the detection and the other clearing...
The demining team uncovered three Type 72a mines and called the supervisor to deal with them. The vi...
At 12:45 he initiated a mine with his detector, causing him to stagger backwards and collapse about ...
The victim was a prodder man and he and his partner had already cleared about 20m and had found abou...
The victim\u27s partner placed a start stick about 25cm away from the marked edge of the safe lane f...
At the time of the accident, Victim No.1 was excavating a detector reading. Victim No.2 was the dete...
The demining team were clearing land so that an NGO could build a road. There was a deserted house a...
Victim No,1 was working with Victim No.2 to his right when he saw a bush with a pile of PMN-2 mines ...
The victim was working as a detector man and at 10:25 he changed roles within the team. Instead of r...
At 08:20 the victim located a mine and bent down to place a marker. At that point he had a dizzy spe...
The working area was on the Cambodian mid-level (as opposed to flood plain and mountainous area) so ...
Meanwhile deminers from another team approached and joined the two who had moved closer to the stick...
The victim stood on a mine at approximately 13:10 and was injured with left leg amputated . He was ...
The victim was the vegetation cutter and prodder man. He cleared 50cm of vegetation at the end of th...
The two victims were walking through a cleared area to the rest area at the completion of their day...
The demining pair were clearing a lane as a team with one doing the detection and the other clearing...
The demining team uncovered three Type 72a mines and called the supervisor to deal with them. The vi...
At 12:45 he initiated a mine with his detector, causing him to stagger backwards and collapse about ...
The victim was a prodder man and he and his partner had already cleared about 20m and had found abou...
The victim\u27s partner placed a start stick about 25cm away from the marked edge of the safe lane f...
At the time of the accident, Victim No.1 was excavating a detector reading. Victim No.2 was the dete...
The demining team were clearing land so that an NGO could build a road. There was a deserted house a...
Victim No,1 was working with Victim No.2 to his right when he saw a bush with a pile of PMN-2 mines ...
The victim was working as a detector man and at 10:25 he changed roles within the team. Instead of r...
At 08:20 the victim located a mine and bent down to place a marker. At that point he had a dizzy spe...
The working area was on the Cambodian mid-level (as opposed to flood plain and mountainous area) so ...
Meanwhile deminers from another team approached and joined the two who had moved closer to the stick...
The victim stood on a mine at approximately 13:10 and was injured with left leg amputated . He was ...
The victim was the vegetation cutter and prodder man. He cleared 50cm of vegetation at the end of th...
The two victims were walking through a cleared area to the rest area at the completion of their day...
The demining pair were clearing a lane as a team with one doing the detection and the other clearing...