The investigators determined that the victim was clearing a lane when he found a detector reading, marked it, and started to excavate with a pick. He hit the mine with the pick at 09:35 and sustained injuries to his hands and right shoulder
The victim was carrying out a normal excavation drill at 10:45 when a mine, suspected R2M2…function...
The demining team had been working at the site since February. The Victim was working in a breaching...
On 22 August 2008 while de-miner [the Victim] was working in his clearance lane from up downward dir...
The investigators determined that, after a dog had signalled at a spot, the deminer located a signal...
The victim was working normally and got a reading from his detector which the investigators believe ...
The investigators determined that the victim was working in a breaching lane when he got a detecto...
The investigators determined that the victim used his detector over the two meter clearance lane he ...
The investigators found that the victim was investigating a detector reading in a squatting position...
The investigators determined that the victim was clearing a breaching lane. He got a detector readin...
The investigators decided that the victim was working with a detector when he got a signal from a fr...
The investigators determined that the deminer was excavating to investigate a detector reading whe...
The investigators determined that the victim and his partner were clearing a lane into the edge of a...
The investigators decided that the victim was exposing a detector reading and found several tin-cans...
The victim had been investigating a detector reading (at around 11:00) with his prodder when a mine ...
In one of the lane where [the Victim] deminer was excavating the ground to locate a signal made by i...
The victim was carrying out a normal excavation drill at 10:45 when a mine, suspected R2M2…function...
The demining team had been working at the site since February. The Victim was working in a breaching...
On 22 August 2008 while de-miner [the Victim] was working in his clearance lane from up downward dir...
The investigators determined that, after a dog had signalled at a spot, the deminer located a signal...
The victim was working normally and got a reading from his detector which the investigators believe ...
The investigators determined that the victim was working in a breaching lane when he got a detecto...
The investigators determined that the victim used his detector over the two meter clearance lane he ...
The investigators found that the victim was investigating a detector reading in a squatting position...
The investigators determined that the victim was clearing a breaching lane. He got a detector readin...
The investigators decided that the victim was working with a detector when he got a signal from a fr...
The investigators determined that the deminer was excavating to investigate a detector reading whe...
The investigators determined that the victim and his partner were clearing a lane into the edge of a...
The investigators decided that the victim was exposing a detector reading and found several tin-cans...
The victim had been investigating a detector reading (at around 11:00) with his prodder when a mine ...
In one of the lane where [the Victim] deminer was excavating the ground to locate a signal made by i...
The victim was carrying out a normal excavation drill at 10:45 when a mine, suspected R2M2…function...
The demining team had been working at the site since February. The Victim was working in a breaching...
On 22 August 2008 while de-miner [the Victim] was working in his clearance lane from up downward dir...