The mined area was a road that linked Malay with National Route 5. The victim was working as a prodder man in one of the ditches that ran along both sides of the road. He was squatting at the bottom and working his way up the side. The ground had a very hard crust to a depth of 2cm and was soft underneath. The victim\u27s partner marked a reading and then moved back to allow the victim to investigate. Because the ground was hard, the victim used a trowel to break up the surface, but initiated the mine
The two victims were walking through a cleared area to the rest area at the completion of their day...
At 12:45 he initiated a mine with his detector, causing him to stagger backwards and collapse about ...
The victim stated that he was prodding to a depth of about 8cm and did not feel the mine before it e...
The victim was investigating the source of a detector reading in an area where the ground had a high...
The victim was the vegetation cutter and prodder man. He cleared 50cm of vegetation at the end of th...
The working area was on the Cambodian mid-level (as opposed to flood plain and mountainous area) so ...
The victim was a prodder man and he and his partner had already cleared about 20m and had found abou...
At the time of the accident, Victim No.1 was excavating a detector reading. Victim No.2 was the dete...
The investigators determined that the victim was clearing a breaching lane. He got a detector readin...
The investigators determined that the ditch had contained many mines thought to have been brought in...
The demining team uncovered three Type 72a mines and called the supervisor to deal with them. The vi...
The Victim was working in a breaching party making a lane to the top of the hill. He had been workin...
The victim prodded onto a mine at 07:55. There was a 45cm gap between the accident site and the rec...
At 08:20 the victim located a mine and bent down to place a marker. At that point he had a dizzy spe...
Victim No,1 was working with Victim No.2 to his right when he saw a bush with a pile of PMN-2 mines ...
The two victims were walking through a cleared area to the rest area at the completion of their day...
At 12:45 he initiated a mine with his detector, causing him to stagger backwards and collapse about ...
The victim stated that he was prodding to a depth of about 8cm and did not feel the mine before it e...
The victim was investigating the source of a detector reading in an area where the ground had a high...
The victim was the vegetation cutter and prodder man. He cleared 50cm of vegetation at the end of th...
The working area was on the Cambodian mid-level (as opposed to flood plain and mountainous area) so ...
The victim was a prodder man and he and his partner had already cleared about 20m and had found abou...
At the time of the accident, Victim No.1 was excavating a detector reading. Victim No.2 was the dete...
The investigators determined that the victim was clearing a breaching lane. He got a detector readin...
The investigators determined that the ditch had contained many mines thought to have been brought in...
The demining team uncovered three Type 72a mines and called the supervisor to deal with them. The vi...
The Victim was working in a breaching party making a lane to the top of the hill. He had been workin...
The victim prodded onto a mine at 07:55. There was a 45cm gap between the accident site and the rec...
At 08:20 the victim located a mine and bent down to place a marker. At that point he had a dizzy spe...
Victim No,1 was working with Victim No.2 to his right when he saw a bush with a pile of PMN-2 mines ...
The two victims were walking through a cleared area to the rest area at the completion of their day...
At 12:45 he initiated a mine with his detector, causing him to stagger backwards and collapse about ...
The victim stated that he was prodding to a depth of about 8cm and did not feel the mine before it e...