Deminer in the working lane was searching the area using his prodder. When he finalised his search and finished the working lane, he started to collect the mine tape from the left side of the lane, walking the ”cleared” working lane. That is where he activated with his left foot PMA-3 mine by stepping on it. PMA-3 mine was buried
The demining team had been working at the site since February. The Victim was working in a breaching...
When they moved to the second site, they sent for a local villager to show them where the mines were...
The document states that the demining team were working in a gulley in a wooded area. They had used...
A Team Leader partially detonated a PMA-2 mine whilst deploying his team to their tasks. [Demining g...
Deminer worked in a minefield with a metal detector on a metal contaminated ground. While lifting th...
After lunch four of the deminers were tasked to build a bridge over a creek to allow better access t...
As he was going down the row to mark the end of the row, he stood on two PMA-1 mines on top of each ...
The investigators concluded that the demining group had insufficient lead-time to properly plan th...
A failure to find the PROM-1 mine before the break proved fatal for both deminers, as the new No 1, ...
The victim was working in an area of low brush adjacent to a (then) disused farm vehicle track. He w...
At 09h15, the team arrived to Koshare 1. At 11h15, the Team Leader moves [the Victim] to the new wor...
The work-site leader, [the Victim], came to deminer [Deminer 1] at 9:20 to measure and record the po...
At approximately 08:40 hrs whilst Deminer [name excised] was either investigation a previously ident...
The incident happened while the deminer trying to investigate a signal using the heavy RAKE. The dem...
Work began at the site at 08:00. At 09:50 a deminer reported having found a PMA-3 while prodding [no...
The demining team had been working at the site since February. The Victim was working in a breaching...
When they moved to the second site, they sent for a local villager to show them where the mines were...
The document states that the demining team were working in a gulley in a wooded area. They had used...
A Team Leader partially detonated a PMA-2 mine whilst deploying his team to their tasks. [Demining g...
Deminer worked in a minefield with a metal detector on a metal contaminated ground. While lifting th...
After lunch four of the deminers were tasked to build a bridge over a creek to allow better access t...
As he was going down the row to mark the end of the row, he stood on two PMA-1 mines on top of each ...
The investigators concluded that the demining group had insufficient lead-time to properly plan th...
A failure to find the PROM-1 mine before the break proved fatal for both deminers, as the new No 1, ...
The victim was working in an area of low brush adjacent to a (then) disused farm vehicle track. He w...
At 09h15, the team arrived to Koshare 1. At 11h15, the Team Leader moves [the Victim] to the new wor...
The work-site leader, [the Victim], came to deminer [Deminer 1] at 9:20 to measure and record the po...
At approximately 08:40 hrs whilst Deminer [name excised] was either investigation a previously ident...
The incident happened while the deminer trying to investigate a signal using the heavy RAKE. The dem...
Work began at the site at 08:00. At 09:50 a deminer reported having found a PMA-3 while prodding [no...
The demining team had been working at the site since February. The Victim was working in a breaching...
When they moved to the second site, they sent for a local villager to show them where the mines were...
The document states that the demining team were working in a gulley in a wooded area. They had used...