The victim was working as a deminer in a lane where “mechanical demining” had taken place. He detonated a PMN-2 mine with his “demining tool”
At 10:05 the victim located a PPM-2 at the head of his lane. He called the Team Leader who marked th...
At around 11:10 the victim got a detector reading and began prodding and excavating the ground usin...
On the day of the accident the demining group\u27s ex-pat country Manager went in to investigate the...
When the deminer came alongside the first mine, he located another, and called the victim again. The...
The soil was rocky, highly metallic and with dense vegetation, but still he carried on working only ...
The accident occurred while carrying out a Survey Level 2 at Save minefield and the first deminer wa...
The victim had been investigating a detector reading (at around 11:00) with his prodder when a mine ...
On 22 April 2000, the Deminer was conducting clearance activities in the CS [Cordon Sanitaire] along...
The demining platoon had cleared 5,1602 metres and eight mines at Homoine before the accident . The...
At 09.15 three deminers were injured when a mine detonated while being handled outside the mined are...
The accident occurred during the manual clearance phase. Victim No.1 was clearing a lane and pulled ...
The victim was a Team Leader whose duties included disarming R2M2 mines. At 06:27 the Victim was ne...
The report stated that at “12:50 on 15 April 2000, [the victim] detonated a mine whilst conducting c...
On the day of the accident the victim started work at 07:00 clearing a line to the spot were they e...
The victim was continuing the breach begun by the earlier victim. He worked a further ten metres and...
At 10:05 the victim located a PPM-2 at the head of his lane. He called the Team Leader who marked th...
At around 11:10 the victim got a detector reading and began prodding and excavating the ground usin...
On the day of the accident the demining group\u27s ex-pat country Manager went in to investigate the...
When the deminer came alongside the first mine, he located another, and called the victim again. The...
The soil was rocky, highly metallic and with dense vegetation, but still he carried on working only ...
The accident occurred while carrying out a Survey Level 2 at Save minefield and the first deminer wa...
The victim had been investigating a detector reading (at around 11:00) with his prodder when a mine ...
On 22 April 2000, the Deminer was conducting clearance activities in the CS [Cordon Sanitaire] along...
The demining platoon had cleared 5,1602 metres and eight mines at Homoine before the accident . The...
At 09.15 three deminers were injured when a mine detonated while being handled outside the mined are...
The accident occurred during the manual clearance phase. Victim No.1 was clearing a lane and pulled ...
The victim was a Team Leader whose duties included disarming R2M2 mines. At 06:27 the Victim was ne...
The report stated that at “12:50 on 15 April 2000, [the victim] detonated a mine whilst conducting c...
On the day of the accident the victim started work at 07:00 clearing a line to the spot were they e...
The victim was continuing the breach begun by the earlier victim. He worked a further ten metres and...
At 10:05 the victim located a PPM-2 at the head of his lane. He called the Team Leader who marked th...
At around 11:10 the victim got a detector reading and began prodding and excavating the ground usin...
On the day of the accident the demining group\u27s ex-pat country Manager went in to investigate the...