At approximately 1125hrs, Team Leader [name excised] gave an order to stop work, as he was preparing to dispose the previously located mines and he required all the Deminers to retire to the safe area. On hearing the signal to stop work, [the Victim] then continued to probe around the mine in an attempt to identify the body perimeter of the mine, when there was an uncontrolled detonation
At 09.10hrs on the 22nd of September 2004, deminer [the Victim] was carrying out manual clearance us...
The deminer was trying to clear the AP mine in a cluster, there was no signal due to the depth of th...
At approximately 08:40 hrs whilst Deminer [name excised] was either investigation a previously ident...
At the time of the accident [Demining group] Manual Clearance Team No3 were operational on the South...
The Team Leader started to walk out to the rest area and [the victim] started to mark the cleared ar...
As he excavated closer to the position of the signal he stopped and swept again with the detector. A...
He had excavated approximately 15 cms towards the initial signal and 5 cms in depth when he came to ...
On the day of the accident a [1st commercial demining group] Deminer was conducting manual clearance...
When the deminer came alongside the first mine, he located another, and called the victim again. The...
At 09h15, the team arrived to Koshare 1. At 11h15, the Team Leader moves [the Victim] to the new wor...
At the time of the accident a Manual Clearance Team were operational on M/F 505 clearance site, at B...
On 21 Dec 2011, the deminer [the Victim] started his work as usual in the assigned task for him to c...
On 05 March 2007, 0935 hrs (local time), [the Victim], a [International demining company] Deminer, i...
The Team leader was preparing to destroy the discovered mines when he was injured in the first mine ...
The deminer was working in SML D which contains M14 AP mines, he indicated the location of the mine ...
At 09.10hrs on the 22nd of September 2004, deminer [the Victim] was carrying out manual clearance us...
The deminer was trying to clear the AP mine in a cluster, there was no signal due to the depth of th...
At approximately 08:40 hrs whilst Deminer [name excised] was either investigation a previously ident...
At the time of the accident [Demining group] Manual Clearance Team No3 were operational on the South...
The Team Leader started to walk out to the rest area and [the victim] started to mark the cleared ar...
As he excavated closer to the position of the signal he stopped and swept again with the detector. A...
He had excavated approximately 15 cms towards the initial signal and 5 cms in depth when he came to ...
On the day of the accident a [1st commercial demining group] Deminer was conducting manual clearance...
When the deminer came alongside the first mine, he located another, and called the victim again. The...
At 09h15, the team arrived to Koshare 1. At 11h15, the Team Leader moves [the Victim] to the new wor...
At the time of the accident a Manual Clearance Team were operational on M/F 505 clearance site, at B...
On 21 Dec 2011, the deminer [the Victim] started his work as usual in the assigned task for him to c...
On 05 March 2007, 0935 hrs (local time), [the Victim], a [International demining company] Deminer, i...
The Team leader was preparing to destroy the discovered mines when he was injured in the first mine ...
The deminer was working in SML D which contains M14 AP mines, he indicated the location of the mine ...
At 09.10hrs on the 22nd of September 2004, deminer [the Victim] was carrying out manual clearance us...
The deminer was trying to clear the AP mine in a cluster, there was no signal due to the depth of th...
At approximately 08:40 hrs whilst Deminer [name excised] was either investigation a previously ident...