Tidal flows in the English Salt Marsh flood over Macomber’s Way daily, creating dangerous driving conditions. Two culverts allow flow to pass through the causeway, which exacerbates scour of marsh banks and vegetation. A design to mitigate erosion and flooding was developed through analysis of water elevations and culvert flowrates throughout a tidal cycle. The recommended design includes a road maintenance plan, the replacement of an existing culvert with a concrete box culvert, and future consideration of a third culvert
For several years, CBEP has worked in close collaboration with Brunswick through the New Meadows Wat...
The purpose of this project was to evaluate available BMPs and ultimately design a system which redu...
Along river banks, on the transition zone between the river and see, tidal marshes can develop. The ...
This project worked with the Town of Norton to investigate the Walker Street crossing of the Wading ...
The Quinsigamond Avenue area in Worcester Massachusetts is a highly commercial zone with a historic ...
Twenty-two road-stream crossings were assessed for the Town of Spencer, MA and the River and Stream ...
For this project, we collaborated with the Town of Framingham to reduce the impacts of urbanization ...
Tidal restrictions include undersized culverts and bridges, tide gates, dikes, and other structures ...
Along river banks, on the transition zone between the river and see, tidal marshes can develop. The ...
The stormwater team addresses flooding and erosion issues. In the spring of 2022, the team analyzed ...
Project Jamaica Bay is a response to superstorm Sandy, occurring in October, 2012. The storm was a d...
For several years, CBEP has worked in close collaboration with Brunswick through the New Meadows Wat...
Roads, bridges, causeways, impoundments, and dikes in the coastal zone often restrict tidal flow to ...
Roads, bridges, causeways, impoundments, and dikes in the coastal zone often restrict tidal flow to ...
Many coastal tidal marshes have been significantly degraded by roadways and other projects that rest...
For several years, CBEP has worked in close collaboration with Brunswick through the New Meadows Wat...
The purpose of this project was to evaluate available BMPs and ultimately design a system which redu...
Along river banks, on the transition zone between the river and see, tidal marshes can develop. The ...
This project worked with the Town of Norton to investigate the Walker Street crossing of the Wading ...
The Quinsigamond Avenue area in Worcester Massachusetts is a highly commercial zone with a historic ...
Twenty-two road-stream crossings were assessed for the Town of Spencer, MA and the River and Stream ...
For this project, we collaborated with the Town of Framingham to reduce the impacts of urbanization ...
Tidal restrictions include undersized culverts and bridges, tide gates, dikes, and other structures ...
Along river banks, on the transition zone between the river and see, tidal marshes can develop. The ...
The stormwater team addresses flooding and erosion issues. In the spring of 2022, the team analyzed ...
Project Jamaica Bay is a response to superstorm Sandy, occurring in October, 2012. The storm was a d...
For several years, CBEP has worked in close collaboration with Brunswick through the New Meadows Wat...
Roads, bridges, causeways, impoundments, and dikes in the coastal zone often restrict tidal flow to ...
Roads, bridges, causeways, impoundments, and dikes in the coastal zone often restrict tidal flow to ...
Many coastal tidal marshes have been significantly degraded by roadways and other projects that rest...
For several years, CBEP has worked in close collaboration with Brunswick through the New Meadows Wat...
The purpose of this project was to evaluate available BMPs and ultimately design a system which redu...
Along river banks, on the transition zone between the river and see, tidal marshes can develop. The ...