The goal of this project was to reduce risks from the applications of the Index Quant team at Deutsche Bank. Because their Index Calculator project is frequently updated, it is important to continuously build the project and check for regression errors. Our task was to deploy and use various existing tools to create both a continuous build system and an automated testing system for this project. By using these tools, we created a comprehensive build system to automatically run the build and the regression tests whenever a change is made to the project code
This project is aimed at redesigning the intersection of I-290 and Vernon Street, including the brid...
This project focuses on two main goals. First is to develop additional contents for the ASSISTments ...
The goal of this Major Qualifying Project (MQP) was to design and build a ski binding tester that co...
This milestones document reports on the instruments for the evaluation studies on the applied games...
This project consisted of performing an energy audit of Higgins Laboratory in order to address curre...
Static Code Analysis (SCA) is the process of analyzing software source code for potential defects. T...
The Major Qualifying Project team collaborated with Global Real Asset team and Alternative Investmen...
This MQP was created for professors in the computer science department – specifically those teaching...
The Computer Enabled Robotic Base Enhancing Remote Unmanned Security (CERBERUS) platform was a parti...
This project describes the design and development of a game-style interface for Core Security’s Core...
This project involves the design and implementation of a Smart Home system using IoT solutions. Thre...
This thesis is framed in a joint project between the TU Darmstadt (Hessen, Germany) and the European...
abstract: Gathering and managing software requirements, known as Requirement Engineering (RE), is a ...
Projecte final de carrera ralitzat en col.laboració amb Lund University. Faculty of EngineeringNowad...
Addressing the uncertainties in fishing activities, the CEDER project examines the use of observer r...
This project is aimed at redesigning the intersection of I-290 and Vernon Street, including the brid...
This project focuses on two main goals. First is to develop additional contents for the ASSISTments ...
The goal of this Major Qualifying Project (MQP) was to design and build a ski binding tester that co...
This milestones document reports on the instruments for the evaluation studies on the applied games...
This project consisted of performing an energy audit of Higgins Laboratory in order to address curre...
Static Code Analysis (SCA) is the process of analyzing software source code for potential defects. T...
The Major Qualifying Project team collaborated with Global Real Asset team and Alternative Investmen...
This MQP was created for professors in the computer science department – specifically those teaching...
The Computer Enabled Robotic Base Enhancing Remote Unmanned Security (CERBERUS) platform was a parti...
This project describes the design and development of a game-style interface for Core Security’s Core...
This project involves the design and implementation of a Smart Home system using IoT solutions. Thre...
This thesis is framed in a joint project between the TU Darmstadt (Hessen, Germany) and the European...
abstract: Gathering and managing software requirements, known as Requirement Engineering (RE), is a ...
Projecte final de carrera ralitzat en col.laboració amb Lund University. Faculty of EngineeringNowad...
Addressing the uncertainties in fishing activities, the CEDER project examines the use of observer r...
This project is aimed at redesigning the intersection of I-290 and Vernon Street, including the brid...
This project focuses on two main goals. First is to develop additional contents for the ASSISTments ...
The goal of this Major Qualifying Project (MQP) was to design and build a ski binding tester that co...