The present study determines the common cycle time for a multi-product finite production rate (FPR) model with rework and an improved delivery policy [1] by an alternative approach. Conventional method to the multi-product FPR problem employs the differential calculus to first prove convexity of the system cost function, then to derive the optimal common production cycle time that minimizes the long-run average system cost per unit time; whereas the proposed approach obtains the optimal cycle time without the need to reference the differential calculus. Such a simplified method may help those practitioners who have insufficient knowledge of calculus to effectively manage the real-life multi-product FPR problem
This study proposes a two-phase, algebraic approach to resolve the rotation cycle time and number of...
AbstractIn a recent paper, Chiu et al. (2014) utilized mathematical modeling and differential calcul...
Facing global market’s rigid competition, today’s manufacturers need not only to satisfy the timely ...
This paper determines the optimal common production cycle time for a multi-item finite production ra...
This paper determines the optimal common production cycle time for a multi-item finite production ra...
555-559This study resolves a multi-product finite production rate (FPR) model with rework and a mu...
A multi-item finite production rate (FPR) model with rework and an improved delivery policy is exami...
Facing stiff competition in worldwide markets, capability of meeting timely demands of multiproduct ...
This study examines a delayed differentiation multi-product single-machine finite production rate (F...
This study examines a delayed differentiation multi-product single-machine finite production rate (F...
This study examines a delayed differentiation multi-product single-machine finite production rate (F...
This study examines a delayed differentiation multi-product single-machine finite production rate (F...
This paper concerns a delayed differentiation multi-product finite production rate (FPR) model with ...
This paper concerns a delayed differentiation multi-product finite production rate (FPR) model with ...
435-440This study is concerned with the optimal common cycle time for a multi-item production syste...
This study proposes a two-phase, algebraic approach to resolve the rotation cycle time and number of...
AbstractIn a recent paper, Chiu et al. (2014) utilized mathematical modeling and differential calcul...
Facing global market’s rigid competition, today’s manufacturers need not only to satisfy the timely ...
This paper determines the optimal common production cycle time for a multi-item finite production ra...
This paper determines the optimal common production cycle time for a multi-item finite production ra...
555-559This study resolves a multi-product finite production rate (FPR) model with rework and a mu...
A multi-item finite production rate (FPR) model with rework and an improved delivery policy is exami...
Facing stiff competition in worldwide markets, capability of meeting timely demands of multiproduct ...
This study examines a delayed differentiation multi-product single-machine finite production rate (F...
This study examines a delayed differentiation multi-product single-machine finite production rate (F...
This study examines a delayed differentiation multi-product single-machine finite production rate (F...
This study examines a delayed differentiation multi-product single-machine finite production rate (F...
This paper concerns a delayed differentiation multi-product finite production rate (FPR) model with ...
This paper concerns a delayed differentiation multi-product finite production rate (FPR) model with ...
435-440This study is concerned with the optimal common cycle time for a multi-item production syste...
This study proposes a two-phase, algebraic approach to resolve the rotation cycle time and number of...
AbstractIn a recent paper, Chiu et al. (2014) utilized mathematical modeling and differential calcul...
Facing global market’s rigid competition, today’s manufacturers need not only to satisfy the timely ...