15 pp. Table, map. T25S, R7E. Captured May 23, 2007.Proposes to replace the current 4-culvert structure with a single, open-bottom arch structure. Includes removal of existing structure to streambed elevation, with embankment materials conserved and culverts removed from Forest land, dewatering of footing sites, bolting the culvert together and backfilling to create the new crossing, which would be paved
5 pp. T 25 S, R 07 E, Sections 2, 3, 34 and 35. Captured January 15, 2008.Announces decision to ca...
5 pp. T. 25 S., R. 6 E., Section 13, 24, 25, and 26 T. 25 S., R. 7 E., Section 18 and 19. Capture...
The current management of roads on national forests, as well as, other public and private roads in f...
15 pp. Maps, tables, references. T20S R7E, Section 35 NW 1/4. Captured May 17, 2007.Proposes to im...
24 pp. Maps, tables. T20S, R7E, Section 12. Captured May 21, 2007.Proposes to remove, reconfigure...
139 pp. Tables, maps, references, appendices. T 23 S, R 6 E, Sections 24, 25, 26, 35 T 23 S, R 7 E...
4 pp. Township 25 South, Range 7 East, Section 6. Captured May 23, 2007.Proposes to replace the cu...
The goal of the Lolo National Forest Fisheries Program is to conserve and restore native fish habita...
27 pp. Maps, tables. Township 19 South, Range 11 East, Sections 15-17, 20, and 22-24. Captured May...
345 pp. Abstract, summary, tables, figures, maps, references, glossary, index, appendices. Township...
7 pp. Township 18 South, Range 10 East, Sections 8, 9, and 10. Captured May 18, 2007.Announces ...
25 pp. Tables, figures, maps, appendices. Township 20 South, Range 7 East, Section 24. May 21, 200...
490 pp. Abstract, summary, tables, maps, index, references, appendices, illus. This project is loca...
4 pp. The location of the project area is T.14 S., R. 1 W., section 33 and 34, and T. 15 S., R.1 W....
17 pp. Map. The private land is located within the Steens Mountain Cooperative Management and Prot...
5 pp. T 25 S, R 07 E, Sections 2, 3, 34 and 35. Captured January 15, 2008.Announces decision to ca...
5 pp. T. 25 S., R. 6 E., Section 13, 24, 25, and 26 T. 25 S., R. 7 E., Section 18 and 19. Capture...
The current management of roads on national forests, as well as, other public and private roads in f...
15 pp. Maps, tables, references. T20S R7E, Section 35 NW 1/4. Captured May 17, 2007.Proposes to im...
24 pp. Maps, tables. T20S, R7E, Section 12. Captured May 21, 2007.Proposes to remove, reconfigure...
139 pp. Tables, maps, references, appendices. T 23 S, R 6 E, Sections 24, 25, 26, 35 T 23 S, R 7 E...
4 pp. Township 25 South, Range 7 East, Section 6. Captured May 23, 2007.Proposes to replace the cu...
The goal of the Lolo National Forest Fisheries Program is to conserve and restore native fish habita...
27 pp. Maps, tables. Township 19 South, Range 11 East, Sections 15-17, 20, and 22-24. Captured May...
345 pp. Abstract, summary, tables, figures, maps, references, glossary, index, appendices. Township...
7 pp. Township 18 South, Range 10 East, Sections 8, 9, and 10. Captured May 18, 2007.Announces ...
25 pp. Tables, figures, maps, appendices. Township 20 South, Range 7 East, Section 24. May 21, 200...
490 pp. Abstract, summary, tables, maps, index, references, appendices, illus. This project is loca...
4 pp. The location of the project area is T.14 S., R. 1 W., section 33 and 34, and T. 15 S., R.1 W....
17 pp. Map. The private land is located within the Steens Mountain Cooperative Management and Prot...
5 pp. T 25 S, R 07 E, Sections 2, 3, 34 and 35. Captured January 15, 2008.Announces decision to ca...
5 pp. T. 25 S., R. 6 E., Section 13, 24, 25, and 26 T. 25 S., R. 7 E., Section 18 and 19. Capture...
The current management of roads on national forests, as well as, other public and private roads in f...