Brinton Davis was hired by President Cherry as the school architect. Between 1908 and 1937, he designed Van Meter Auditorium, Perry Snell Hall, the Heating Plant, Stadium and Colonnade, Gordon Wilson Hall, Industrial Education Building, Schneider Hall, Helm Library (originally the Health Building), Craig Administrative Center (originally the President’s Home), the Kentucky Building, and Cherry Hall.https://digitalcommons.wku.edu/exhibit_2014/1004/thumbnail.jp
Other Names: Kentucky Building Date Built - 1931-1936; interior completed 1939 Dedicated - May 13, 2...
Records created by the President\u27s Office during the Henry Cherry administration regarding the co...
Southern Normal School began as Glasgow Normal School but moved to Bowling Green in 1884. When a 190...
From the Colonnade to the cupola atop Cherry Hall, Brinton Davis designed the structures and symbols...
Booklet created by the Kentucky Library & Museum and the Kentucky Heritage Council for the Bowling G...
This is a photograph of a Board of Regents meeting with architect Brinton B. Davis in Van Meter Hall...
Date Built - 1937Dedicated - Nov. 16, 1937Cost of Construction - $609,000Gross Square Feet - 97,666 ...
Walking tour booklet highlighting the architecture of Brinton B. Davis on WKU\u27s campus. Includes...
Date Built - 1924Dedication - Nov. 19, 1924Date Razed - October 2005Cost of construction - $85,000 A...
Date Built - 1931 as President\u27s HomeDedicated - Oct. 10, 1970 Other Names - Craig Alumni Cente...
Van Meter Hall was the first building constructed atop College Hill for the fledgling Western Kentuc...
Other Names - LibraryDate Built - 1927Dedication - May 13, 1969Cost of Construction - $200,000Archit...
Other Names - DUC 1969-2013Downing Student Union, 2014-Date Built - 1970Dedicated - Oct. 10, 1970Cos...
Built - 1927Dedicated - October 8, 1927Cost of Construction - $50,000 Architect - Brinton DavisNames...
Architectural rendering of the Cedar House by D.X. Murphy. Other Names - Faculty House, Senior House...
Other Names: Kentucky Building Date Built - 1931-1936; interior completed 1939 Dedicated - May 13, 2...
Records created by the President\u27s Office during the Henry Cherry administration regarding the co...
Southern Normal School began as Glasgow Normal School but moved to Bowling Green in 1884. When a 190...
From the Colonnade to the cupola atop Cherry Hall, Brinton Davis designed the structures and symbols...
Booklet created by the Kentucky Library & Museum and the Kentucky Heritage Council for the Bowling G...
This is a photograph of a Board of Regents meeting with architect Brinton B. Davis in Van Meter Hall...
Date Built - 1937Dedicated - Nov. 16, 1937Cost of Construction - $609,000Gross Square Feet - 97,666 ...
Walking tour booklet highlighting the architecture of Brinton B. Davis on WKU\u27s campus. Includes...
Date Built - 1924Dedication - Nov. 19, 1924Date Razed - October 2005Cost of construction - $85,000 A...
Date Built - 1931 as President\u27s HomeDedicated - Oct. 10, 1970 Other Names - Craig Alumni Cente...
Van Meter Hall was the first building constructed atop College Hill for the fledgling Western Kentuc...
Other Names - LibraryDate Built - 1927Dedication - May 13, 1969Cost of Construction - $200,000Archit...
Other Names - DUC 1969-2013Downing Student Union, 2014-Date Built - 1970Dedicated - Oct. 10, 1970Cos...
Built - 1927Dedicated - October 8, 1927Cost of Construction - $50,000 Architect - Brinton DavisNames...
Architectural rendering of the Cedar House by D.X. Murphy. Other Names - Faculty House, Senior House...
Other Names: Kentucky Building Date Built - 1931-1936; interior completed 1939 Dedicated - May 13, 2...
Records created by the President\u27s Office during the Henry Cherry administration regarding the co...
Southern Normal School began as Glasgow Normal School but moved to Bowling Green in 1884. When a 190...