The Mirror one Lower (LM1) is part of the in-vessel quasi-optical beam propagation system for the ITER Electro Cyclotron (EC) Upper Launcher (UL), where eight beams are reflected through four mirrors during its passage to the plasma. The mirrors are grouped into two rows of four beams each and the mirror LM1 refers to a four mirror set. High power millimeter (mm) waves are generated by the gyrotrons and delivered to the in-vessel components via corrugated wave-guides. The design of the LM1 shall guarantee the optimal propagation of the beams during their transmission through the optical system taking into consideration 1) the shape of the reflecting surfaces, 2) loads coming from the beams themselves, the plasma and nuclear reactions as wel...
The aim of the ITER electron cyclotron heating and current drive upper launcher (UL) is to control m...
The purpose of the ITER electron cyclotron resonance heating (ECRH) upper launcher (UL), or antennae...
The purpose of the ITER electron cyclotron resonance heating (ECRH) upper launcher (UL), or antennae...
The mirror M3 is a part of the in-vessel quasi-optical beam propagation system for the ITER electron...
Each of the 4 ITER Electron Cyclotron Heating Upper Launcher (ECHUL) features 8 transmission lines u...
Four of the 16 ITER upper port plugs will be devoted to electron cyclotron resonance heating (ECRH) ...
Four electron cyclotron heating upper launchers (ECHULs) will be used at ITER to counteract magnetoh...
Each of the four ITER Electron Cyclotron Heating Upper Launcher (ECHUL) features eight transmission ...
ITER first mirrors (FMs), as the first components of most ITER optical diagnostics, will be exposed ...
The ITER ECH upper launcher is devoted to directing up to 8 2NM beams per port plug over half of the...
The ITER ECRH system consists of 24 gyrotrons with up to 24 MW installed millimeter wave heating pow...
The ITER ECRH system consists of 24 gyrotrons with up to 24 MW installed millimeter wave heating pow...
The aim of the ITER electron cyclotron heating and current drive upper launcher (UL) is to control m...
The aim of the ITER electron cyclotron heating and current drive upper launcher (UL) is to control m...
The aim of the ITER electron cyclotron heating and current drive upper launcher (UL) is to control m...
The aim of the ITER electron cyclotron heating and current drive upper launcher (UL) is to control m...
The purpose of the ITER electron cyclotron resonance heating (ECRH) upper launcher (UL), or antennae...
The purpose of the ITER electron cyclotron resonance heating (ECRH) upper launcher (UL), or antennae...
The mirror M3 is a part of the in-vessel quasi-optical beam propagation system for the ITER electron...
Each of the 4 ITER Electron Cyclotron Heating Upper Launcher (ECHUL) features 8 transmission lines u...
Four of the 16 ITER upper port plugs will be devoted to electron cyclotron resonance heating (ECRH) ...
Four electron cyclotron heating upper launchers (ECHULs) will be used at ITER to counteract magnetoh...
Each of the four ITER Electron Cyclotron Heating Upper Launcher (ECHUL) features eight transmission ...
ITER first mirrors (FMs), as the first components of most ITER optical diagnostics, will be exposed ...
The ITER ECH upper launcher is devoted to directing up to 8 2NM beams per port plug over half of the...
The ITER ECRH system consists of 24 gyrotrons with up to 24 MW installed millimeter wave heating pow...
The ITER ECRH system consists of 24 gyrotrons with up to 24 MW installed millimeter wave heating pow...
The aim of the ITER electron cyclotron heating and current drive upper launcher (UL) is to control m...
The aim of the ITER electron cyclotron heating and current drive upper launcher (UL) is to control m...
The aim of the ITER electron cyclotron heating and current drive upper launcher (UL) is to control m...
The aim of the ITER electron cyclotron heating and current drive upper launcher (UL) is to control m...
The purpose of the ITER electron cyclotron resonance heating (ECRH) upper launcher (UL), or antennae...
The purpose of the ITER electron cyclotron resonance heating (ECRH) upper launcher (UL), or antennae...