Roaded catchment approx. 22 acres and dam at Westlund property near Kulja East Road and Koorda-Kalannie Road. A larger catchment and no controlled overflow. The bank tunnelled and let stored water flood neighbours property. This image is part of the WISALTS (Whittington Interceptor Sustainable Agriculture Land Treatment Society Incorporated) Collection
Taken from west entrance road looking south west into Hinkley's paddock. A large waterlogged area se...
A water supply trapped in an Interceptor bank which is fed from 2 hectares of sandy recharge. Note t...
A series of banks to drop flood water down to the creek. The bank on the left is 3/4 full of water a...
The Westlund dam and 22 acre catchment built at the top of the rising ground. This image is part ...
Westlund dam showing break in the bank in centre of photo. This image is part of the WISALTS (Whi...
Westlund dam showing a break in the dam to the right of the windmill. This image is part of the W...
Typical of shedding ground - with a hard conglomerate base. Not a very deep bank, but it has success...
Surveyors Report on WISALTS Conservation System created by JB (John) Kimber. Comments: Property h...
Full dam overflow picked up by bank and delivered to safe disposal point. This image is part of t...
Shallow throughflows cut off by a medium depth bank. This image is part of the WISALTS (Whittingt...
Bank picking up overflow from dam, emptying at waterway for safe disposal of excess water. Bare area...
Photo A. The uncontrolled overflow of a dam near Kondut. A grade bank fills the dam and the overflow...
Surveyors Report on WISALTS Conservation System created by KL (Ken) Olden. Comments: Throughflow ...
Surveyors Report on WISALTS Conservation System created by KL (Ken) Olden. Comments: Bank on left...
Trees recovering below an Interceptor. A successfully sealed bank giving protection against waterlog...
Taken from west entrance road looking south west into Hinkley's paddock. A large waterlogged area se...
A water supply trapped in an Interceptor bank which is fed from 2 hectares of sandy recharge. Note t...
A series of banks to drop flood water down to the creek. The bank on the left is 3/4 full of water a...
The Westlund dam and 22 acre catchment built at the top of the rising ground. This image is part ...
Westlund dam showing break in the bank in centre of photo. This image is part of the WISALTS (Whi...
Westlund dam showing a break in the dam to the right of the windmill. This image is part of the W...
Typical of shedding ground - with a hard conglomerate base. Not a very deep bank, but it has success...
Surveyors Report on WISALTS Conservation System created by JB (John) Kimber. Comments: Property h...
Full dam overflow picked up by bank and delivered to safe disposal point. This image is part of t...
Shallow throughflows cut off by a medium depth bank. This image is part of the WISALTS (Whittingt...
Bank picking up overflow from dam, emptying at waterway for safe disposal of excess water. Bare area...
Photo A. The uncontrolled overflow of a dam near Kondut. A grade bank fills the dam and the overflow...
Surveyors Report on WISALTS Conservation System created by KL (Ken) Olden. Comments: Throughflow ...
Surveyors Report on WISALTS Conservation System created by KL (Ken) Olden. Comments: Bank on left...
Trees recovering below an Interceptor. A successfully sealed bank giving protection against waterlog...
Taken from west entrance road looking south west into Hinkley's paddock. A large waterlogged area se...
A water supply trapped in an Interceptor bank which is fed from 2 hectares of sandy recharge. Note t...
A series of banks to drop flood water down to the creek. The bank on the left is 3/4 full of water a...