The wellbeing of the mine and underground workers directly rely on the accuracy of wall stations that controls the workings on the mine. Some of the daily responsibilities of a mine surveyor comprise of staking out construction lines to control the direction and gradient of development drives. When there is deviation in the direction and gradient of construction lines in relation to the design it can lead to damage to infrastructure within the mine that causes problems such as re-development or altering designs which are expensive. This is why it is significant high order check surveys are undertaken to follow up advancing capital development as a means to verify the quality of existing wall stations and provide accurate control to further ...
Ore passes play a vital role in underground mining operations by facilitating the gravity-driven mov...
The surveying and mining industries have undergone significant changes over the past thirty years. T...
Open pit slope design requires sufficient geotechnical data to establish a representative geotechnic...
A mine surveyor provides services from early design and project implementation throughout a mine`s l...
The accuracy of all underground surveying is regulated by the standards described in the South Afric...
This thesis proposes an alternative method of mine surveying in order to improve the safety and accu...
The errors affecting linear measurements are so numerous, of such a variable nature and so inter -...
Dam walls are monitored by surveyors periodically to ensure that there is no deformation movement wi...
[Abstract]: Environmental conditions in underground coal mines effect lateral refraction when survey...
At present there is a lack of an instrument to measure the trajectory of up-holes in a safe and effi...
ABSTRACT: As Underground (UG) coal mining companies look to reduce costs, whilst attempting to mine ...
Strata movement has adverse impacts on structures located on the surface and in the subsurface withi...
As Underground (UG) coal mining companies look to reduce costs, whilst attempting to mine through in...
The name of this thesis is suggestive of its character. The writer has endeavored to resent in a gen...
Surface mines are going deeper and deeper with the passage of time. The maximum stripping ratio bein...
Ore passes play a vital role in underground mining operations by facilitating the gravity-driven mov...
The surveying and mining industries have undergone significant changes over the past thirty years. T...
Open pit slope design requires sufficient geotechnical data to establish a representative geotechnic...
A mine surveyor provides services from early design and project implementation throughout a mine`s l...
The accuracy of all underground surveying is regulated by the standards described in the South Afric...
This thesis proposes an alternative method of mine surveying in order to improve the safety and accu...
The errors affecting linear measurements are so numerous, of such a variable nature and so inter -...
Dam walls are monitored by surveyors periodically to ensure that there is no deformation movement wi...
[Abstract]: Environmental conditions in underground coal mines effect lateral refraction when survey...
At present there is a lack of an instrument to measure the trajectory of up-holes in a safe and effi...
ABSTRACT: As Underground (UG) coal mining companies look to reduce costs, whilst attempting to mine ...
Strata movement has adverse impacts on structures located on the surface and in the subsurface withi...
As Underground (UG) coal mining companies look to reduce costs, whilst attempting to mine through in...
The name of this thesis is suggestive of its character. The writer has endeavored to resent in a gen...
Surface mines are going deeper and deeper with the passage of time. The maximum stripping ratio bein...
Ore passes play a vital role in underground mining operations by facilitating the gravity-driven mov...
The surveying and mining industries have undergone significant changes over the past thirty years. T...
Open pit slope design requires sufficient geotechnical data to establish a representative geotechnic...