AbstractEnergy from prompt and delayed gammas in actual and future nuclear systems are more and more taken into account into design studies as they play an important role in the assessment of performance and safety concerns. Their incomplete knowledge (both prompt and delayed) require to take conservative design margins on local dimensioning parameters, thus reducing the awaited performances or flexibility of these facilities, with costs that are far from being negligible. The local energy photon deposit must be accurately known for Generation-III (Gen-III), Generation-IV (Gen-IV) or the new MTR Jules Horowitz Reactor (JHR). The last 2 decades has seen the realization, in Zero Power Reactors (ZPR), of several programs partially devoted to γ...