AbstractThe original PERT technique assumes β distribution for the activity durations. The developments of the past decades have partly refuted this concept; and many different distributions have been introduced.In our research, various distributions (uniform, triangular, β) are applied in case of closed large-scale infrastructure projects.In this paper, the possible effects of these distributions on the project duration are investigated. It is shown that the use of different distributions with the same three-point estimation has a smaller effect on the project duration than a 10% difference in the values of the three-point estimation
The critical path method (CPM), project evaluation and review technique (PERT), and stochastic PERT,...
Most construction managers use deterministic scheduling techniques to plan construction projects an...
The traditional PERT (Program Evaluation and Review Technique) model uses beta distribution as the d...
In order to validate the assumption of beta distributed activity durations in the PERT algorithm, a ...
Construction projects are subject to risk. There are a number of methods that allow the planner to c...
The risk of the duration of a project exceeding a certain limit has been studied since the early pap...
AbstractMany authors have discussed the source of errors in PERT networks as follows: Uncertainty in...
This paper builds upon earlier work from the decision/risk analysis area in presenting simple, easy-...
this paper. The project starts at the initial node and ends at the terminal node. A path is a set of...
This paper analyses the project completion time distribution in a Markovian PERT network. Several te...
International audienceIn project or production management, an activity network is classically define...
Variations in the durations of activities are commonplace in the construction industry. This is due ...
Most studies of project time estimation assume that (a) activity times are mutually independent rand...
In project management, the main purpose of proposed methods is project scheduling which helps to man...
The PERT-based method for estimation of project implementation time, which uses Rayleigh distributio...
The critical path method (CPM), project evaluation and review technique (PERT), and stochastic PERT,...
Most construction managers use deterministic scheduling techniques to plan construction projects an...
The traditional PERT (Program Evaluation and Review Technique) model uses beta distribution as the d...
In order to validate the assumption of beta distributed activity durations in the PERT algorithm, a ...
Construction projects are subject to risk. There are a number of methods that allow the planner to c...
The risk of the duration of a project exceeding a certain limit has been studied since the early pap...
AbstractMany authors have discussed the source of errors in PERT networks as follows: Uncertainty in...
This paper builds upon earlier work from the decision/risk analysis area in presenting simple, easy-...
this paper. The project starts at the initial node and ends at the terminal node. A path is a set of...
This paper analyses the project completion time distribution in a Markovian PERT network. Several te...
International audienceIn project or production management, an activity network is classically define...
Variations in the durations of activities are commonplace in the construction industry. This is due ...
Most studies of project time estimation assume that (a) activity times are mutually independent rand...
In project management, the main purpose of proposed methods is project scheduling which helps to man...
The PERT-based method for estimation of project implementation time, which uses Rayleigh distributio...
The critical path method (CPM), project evaluation and review technique (PERT), and stochastic PERT,...
Most construction managers use deterministic scheduling techniques to plan construction projects an...
The traditional PERT (Program Evaluation and Review Technique) model uses beta distribution as the d...