AbstractThis paper addresses the single-item, dynamic lot-sizing problem for systems with remanufacturing and outsourcing. Therein, demand and return amounts are deterministic over a finite planning horizon. Demand may be satisfied by the manufacturing of new items, remanufactured items, or outsourcing, but it cannot be backlogged. The objective of this study is to determine the lot sizes for manufacturing, remanufacturing, and outsourcing that minimise the total cost, which consists of the holding costs for returns and manufactured/remanufactured products, setup costs, and outsourcing costs. The problems addressed in this paper are an extension of those addressed by Richter et al. (2000,and 2001), Teunter et al. (2006), and Aksen et al. (2...
The dynamic lot-sizing problem under a time-varying environment considers new features of the produc...
We consider a production system where demand can be met by manufacturing new products and remanufact...
International audienceThis paper addresses a real-life production planning problem arising in a manu...
AbstractThis paper addresses the single-item, dynamic lot-sizing problem for systems with remanufact...
We address the dynamic lot sizing problem for systems with product returns. The demandand return amo...
We address the dynamic lot sizing problem for systems with product returns. The demand and return am...
In a single item dynamic lot-sizing problem, we are given a time horizon and demand for a single ite...
In a single item dynamic lot-sizing problem, we are given a time horizon and demand for a single ite...
In a single item dynamic lot-sizing problem, we are given a time horizon and demand for a single ite...
Remanufacturing is one of advanced product recovery options in which end-of-use/life products are re...
In this paper, the capacitated dynamic lot sizing problem in integrated manufac-turing/remanufacturi...
We address an extension of the discrete lot-sizing and scheduling problem in which the demand of pro...
In this paper, a case study is carried out concerning the lot-sizing problem involving a single item...
textabstractWithin the framework of reverse logistics, the classic economic lot-sizing problem has b...
Remanufacturing processes face uncertainty in the quality of the items being returned by customers, ...
The dynamic lot-sizing problem under a time-varying environment considers new features of the produc...
We consider a production system where demand can be met by manufacturing new products and remanufact...
International audienceThis paper addresses a real-life production planning problem arising in a manu...
AbstractThis paper addresses the single-item, dynamic lot-sizing problem for systems with remanufact...
We address the dynamic lot sizing problem for systems with product returns. The demandand return amo...
We address the dynamic lot sizing problem for systems with product returns. The demand and return am...
In a single item dynamic lot-sizing problem, we are given a time horizon and demand for a single ite...
In a single item dynamic lot-sizing problem, we are given a time horizon and demand for a single ite...
In a single item dynamic lot-sizing problem, we are given a time horizon and demand for a single ite...
Remanufacturing is one of advanced product recovery options in which end-of-use/life products are re...
In this paper, the capacitated dynamic lot sizing problem in integrated manufac-turing/remanufacturi...
We address an extension of the discrete lot-sizing and scheduling problem in which the demand of pro...
In this paper, a case study is carried out concerning the lot-sizing problem involving a single item...
textabstractWithin the framework of reverse logistics, the classic economic lot-sizing problem has b...
Remanufacturing processes face uncertainty in the quality of the items being returned by customers, ...
The dynamic lot-sizing problem under a time-varying environment considers new features of the produc...
We consider a production system where demand can be met by manufacturing new products and remanufact...
International audienceThis paper addresses a real-life production planning problem arising in a manu...