AbstractTo ensure the crossing of the Someş River in the city of Cluj-Napoca, a new footbridge was designed in order to replace the old one using a trapezoidal composite steel-concrete box girder solution. For architectural reasons, the depth of the girder was chosen relatively small and constant, so the ratio depth/span is of 1/30 approximately.The footbridge has a span of 58.00 m, with a width of 6.00m and a depth of 2.00 m and the deck includes two pedestrian lanes of 1.60 m each and a cyclist lane in the central part of the deck of 2.50 m.Due to the fact that there is a high power line above the river, the constructive solutions of suspension, cable stayed or an arch bridge were not viable.The paper presents the solution adopted for the...