AbstractIn order to optimise the safety of underground rock engineering construction and the long-term security of the resultant facilities, it is necessary to have a knowledge of the likely hazards. These risks or hazards fall into the four categories of “known beforehand and relatively easily addressed”, “known beforehand and not easily addressed”, “not known beforehand and relatively easily addressed”, and “not known beforehand and not easily addressed”. This paper describes how these four types of hazard can be incorporated into a design methodology approach, including the process by which the relevant mechanical rock mass parameters can be recognised for modelling and hence predictive purposes. In particular, there is emphasis on the f...
Due to the restrictions to surface construction, underground works have a great evolution potential....
Society increasingly requires the engineer to quantify and manage the risk which people, property an...
This paper discusses the use of risk assessment and risk management techniques within the Australian...
AbstractIn order to optimise the safety of underground rock engineering construction and the long-te...
Mining industry has been known for the risks that are present while working in a confined undergroun...
One of the main concerns in underground rock construction is the complexity and uncertainty of the g...
ABSTRACT: Traditionally, tunnels have been designed using empirical methods and a semi-observational...
In comparison with other types of construction, the development of rock engineering design codes has...
2 Mining is considered a high risk industry for investment purposes, as the development of new mines...
This paper discusses a systematic approach to underground ring design as well as a methodology for t...
Tunnels should be constructed, maintained and used without neglecting the basic principia of Occupat...
Probabilistic design is gaining wider acceptance in the rock engineering community since it allows m...
Risk is part of every sector of engineering design. It is a consequence of the uncertainties connect...
Abstract: The paper discusses the requirements of the Quarries Regulations 1999 and suggests practic...
A systematic but straightforward probabilistic approach was adopted for the preliminary design using...
Due to the restrictions to surface construction, underground works have a great evolution potential....
Society increasingly requires the engineer to quantify and manage the risk which people, property an...
This paper discusses the use of risk assessment and risk management techniques within the Australian...
AbstractIn order to optimise the safety of underground rock engineering construction and the long-te...
Mining industry has been known for the risks that are present while working in a confined undergroun...
One of the main concerns in underground rock construction is the complexity and uncertainty of the g...
ABSTRACT: Traditionally, tunnels have been designed using empirical methods and a semi-observational...
In comparison with other types of construction, the development of rock engineering design codes has...
2 Mining is considered a high risk industry for investment purposes, as the development of new mines...
This paper discusses a systematic approach to underground ring design as well as a methodology for t...
Tunnels should be constructed, maintained and used without neglecting the basic principia of Occupat...
Probabilistic design is gaining wider acceptance in the rock engineering community since it allows m...
Risk is part of every sector of engineering design. It is a consequence of the uncertainties connect...
Abstract: The paper discusses the requirements of the Quarries Regulations 1999 and suggests practic...
A systematic but straightforward probabilistic approach was adopted for the preliminary design using...
Due to the restrictions to surface construction, underground works have a great evolution potential....
Society increasingly requires the engineer to quantify and manage the risk which people, property an...
This paper discusses the use of risk assessment and risk management techniques within the Australian...