This paper presents a mathematical model for the multi-mode resource-constrained project scheduling problem with maximizing the net present value of project. The proposed model is inspired by MRCPSP-GPR. Firstly, we presented an exact model solving MRCPSP_GPR then we expanded the model to estimate other cost-related options, penalty-related expenditure is a case in point. As a result of estimating different factors which impact on project scheduling such as reward and penalty of finishing the project, managers can efficiently make a better decision. For better adaptation with real conditions, we consider two payment methods in two objective functions. The adjusted schedule by proposed model and solving time was logical. Moreover, to verify ...
In this paper, a backward approach is proposed for maximizing net present value (NPV) in multi-mode ...
In this paper, the multimode payment scheduling project is studied, which aims to maximize the net p...
The resource-constrained project-scheduling problem with discounted cash flows is studied. Each acti...
This manuscript focuses on the single- and multi-mode resource-constrained project scheduling proble...
© 2015 Elsevier Ltd. This manuscript focuses on the single- and multi-mode resource-constrained proj...
The main purposes of this study are to incorporate both the project delay penalty and early completi...
This paper presents a Resource-Constrained Project Scheduling Problem (RCPSP) settled by contractual...
In this paper, we study the resource-constrained project scheduling problem (RCPSP) with discounted ...
Tyt. z nagłówka.Bibliogr. s. 67-68.This paper presents a Resource-Constrained Project Scheduling Pro...
In this paper, we discuss the resource-constrained project scheduling problem with discounted cash f...
The issue of resource over-allocating is a big concern for project engineers in the process of sched...
This chapter reports on a new solution approach for the multi-mode resource-constrained project sche...
This paper presents an improved hybrid method for the resource-constrained project scheduling proble...
Abstract- Project management is a complex decision making process involving the unrelenting pressure...
In this paper, we study the capital-constrained project scheduling problem with discounted cash flow...
In this paper, a backward approach is proposed for maximizing net present value (NPV) in multi-mode ...
In this paper, the multimode payment scheduling project is studied, which aims to maximize the net p...
The resource-constrained project-scheduling problem with discounted cash flows is studied. Each acti...
This manuscript focuses on the single- and multi-mode resource-constrained project scheduling proble...
© 2015 Elsevier Ltd. This manuscript focuses on the single- and multi-mode resource-constrained proj...
The main purposes of this study are to incorporate both the project delay penalty and early completi...
This paper presents a Resource-Constrained Project Scheduling Problem (RCPSP) settled by contractual...
In this paper, we study the resource-constrained project scheduling problem (RCPSP) with discounted ...
Tyt. z nagłówka.Bibliogr. s. 67-68.This paper presents a Resource-Constrained Project Scheduling Pro...
In this paper, we discuss the resource-constrained project scheduling problem with discounted cash f...
The issue of resource over-allocating is a big concern for project engineers in the process of sched...
This chapter reports on a new solution approach for the multi-mode resource-constrained project sche...
This paper presents an improved hybrid method for the resource-constrained project scheduling proble...
Abstract- Project management is a complex decision making process involving the unrelenting pressure...
In this paper, we study the capital-constrained project scheduling problem with discounted cash flow...
In this paper, a backward approach is proposed for maximizing net present value (NPV) in multi-mode ...
In this paper, the multimode payment scheduling project is studied, which aims to maximize the net p...
The resource-constrained project-scheduling problem with discounted cash flows is studied. Each acti...