A three stage production system is considered in this paper. There are two stages to fabricate and ready the parts and an assembly stage to assembly the parts and complete the products in this system. Suppose that a number of products of different kinds are ordered. Each product is assembled with a set of several parts. At first the parts are produced in the first stage with parallel machines and then they are controlled and ready in the second stage and finally the parts are assembled in an assembly stage to produce the products. Two objective functions are considered that are: (1) to minimizing the completion time of all products (makespan), and (2) minimizing the sum of earliness and tardiness of all products (∑_i▒(E_i∕T_i ) . Since this...
http://www.emse.fr/spip/IMG/pdf/RR_2007-500-011.pdfWe study a problem of optimal scheduling and lot-...
In this paper a novel mathematical model has been proposed for multi-objective scheduling problem in...
AbstractThe corrugator scheduling problem is a difficult problem due to a wide varietyof parameters ...
This paper addresses a multi-objective order scheduling problem in production planning under a compl...
This paper introduces a multi-factory scheduling problem with heterogeneous factories and parallel m...
A Mixed-model assembly line is widely employed to perform the assembly operation in industries and t...
A job shop production system processes after set up batches of products in some specific sequences. ...
This paper describes a multi-objective evolutionary algorithm for a typical serial production proble...
International audienceThis article studies a problem of optimal scheduling and lot sizing a number o...
In optimization, scheduling problem is concerning allocations of some resources which are usually li...
Abstract The aim of the present work is to define and to optimize an assembly line that processes pa...
Assembly job shop scheduling problem (AJSP) is one of the most complicated combinatorial optimizatio...
International audienceWe study a problem of optimal scheduling and lot-sizing a number of products o...
The multi-criteria problem of scheduling n jobs on a single machine was considered in this paper. Th...
Scheduling problems can be seen as multi-objective optimization problems (MOPs), involving the simul...
http://www.emse.fr/spip/IMG/pdf/RR_2007-500-011.pdfWe study a problem of optimal scheduling and lot-...
In this paper a novel mathematical model has been proposed for multi-objective scheduling problem in...
AbstractThe corrugator scheduling problem is a difficult problem due to a wide varietyof parameters ...
This paper addresses a multi-objective order scheduling problem in production planning under a compl...
This paper introduces a multi-factory scheduling problem with heterogeneous factories and parallel m...
A Mixed-model assembly line is widely employed to perform the assembly operation in industries and t...
A job shop production system processes after set up batches of products in some specific sequences. ...
This paper describes a multi-objective evolutionary algorithm for a typical serial production proble...
International audienceThis article studies a problem of optimal scheduling and lot sizing a number o...
In optimization, scheduling problem is concerning allocations of some resources which are usually li...
Abstract The aim of the present work is to define and to optimize an assembly line that processes pa...
Assembly job shop scheduling problem (AJSP) is one of the most complicated combinatorial optimizatio...
International audienceWe study a problem of optimal scheduling and lot-sizing a number of products o...
The multi-criteria problem of scheduling n jobs on a single machine was considered in this paper. Th...
Scheduling problems can be seen as multi-objective optimization problems (MOPs), involving the simul...
http://www.emse.fr/spip/IMG/pdf/RR_2007-500-011.pdfWe study a problem of optimal scheduling and lot-...
In this paper a novel mathematical model has been proposed for multi-objective scheduling problem in...
AbstractThe corrugator scheduling problem is a difficult problem due to a wide varietyof parameters ...