Municipal waste landfill leachate formed at different stages of the operation of the landfill, has a negative impact on the natural environment. According to the newly implemented waste management policy on modern solid waste deposit sites, landfill leachate has to be monitored. Five experimental columns were constructed in size of 500 mm long and 200 mm in diameter. They were filled with different fillers. The flow of leachate allowed for calculation of the leachate volume per year in a landfill, where it was taken. The experiment was carried out for 365 days. Significant change of the porosity was determined in all columns. Although the landfill for this period represents only 1/50 or less of the operation time, the laboratory tests found...