In practical production, the balance of the assembly lines is always destroyed by many factors, e.g., demand fluctuations, disruptions caused by workstation breakdowns or shutdowns, and changes of the work force. Therefore, this paper addresses the type II rebalancing problem for the two-sided assembly lines (TALRBP-II), which are widely utilized to assemble large-size high-volume products. As we all know that TALBP-II (two-sided assembly line balancing problem type-II) is NP-hard, TALRBP-II is its extension and much more complex. In order to solve this problem, a mathematical model with the objectives of minimizing cycle time and rebalancing cost is proposed. Constraint programming (CP) method is applied to optimize the model and a worksta...
In this thesis, we define a new problem area for assembly lines. In the literature, there are variou...
A production system which consists of a number of parallel assembly lines is considered. On each lin...
The simple assembly line balancing problem type E (abbreviated as SALBP-E) occurs when the number of...
In practical production, the balance of the assembly lines is always destroyed by many factors, e.g....
[[abstract]]Two-sided assembly line balancing problem (TALBP) is commonly seen in the industries of ...
Abstract. A heuristic procedure for solving the two-criterion assembly line balancing (2CALB) proble...
The two-sided assembly line balancing problem type-II (TALBP-II) is of major importance for the reco...
PINARBASI, MEHMET/0000-0003-3424-2967WOS: 000490968600005Purpose Main constraints for an assembly li...
Assembly line balancing (ALB) is concerned with assigning tasks within an assembly line to meet the ...
Two-sided assembly line balancing (2S-ALB) problems is practically useful in improving the productio...
The Assembly Line Balancing Problem (ALBP) consists in assigning tasks to operators engaged on a l...
<span>This paper presents a new constraint programming model for mixed-model assembly line balancing...
AbstractAssembly line is a sequential work flow production systems which are still typical in the ma...
The Assembly Line Balancing Problem (ALBP) consists in the assignment of tasks to operators engaged ...
Part 1: Sustainable ProductionInternational audienceIn this paper, we propose a mathematical optimis...
In this thesis, we define a new problem area for assembly lines. In the literature, there are variou...
A production system which consists of a number of parallel assembly lines is considered. On each lin...
The simple assembly line balancing problem type E (abbreviated as SALBP-E) occurs when the number of...
In practical production, the balance of the assembly lines is always destroyed by many factors, e.g....
[[abstract]]Two-sided assembly line balancing problem (TALBP) is commonly seen in the industries of ...
Abstract. A heuristic procedure for solving the two-criterion assembly line balancing (2CALB) proble...
The two-sided assembly line balancing problem type-II (TALBP-II) is of major importance for the reco...
PINARBASI, MEHMET/0000-0003-3424-2967WOS: 000490968600005Purpose Main constraints for an assembly li...
Assembly line balancing (ALB) is concerned with assigning tasks within an assembly line to meet the ...
Two-sided assembly line balancing (2S-ALB) problems is practically useful in improving the productio...
The Assembly Line Balancing Problem (ALBP) consists in assigning tasks to operators engaged on a l...
<span>This paper presents a new constraint programming model for mixed-model assembly line balancing...
AbstractAssembly line is a sequential work flow production systems which are still typical in the ma...
The Assembly Line Balancing Problem (ALBP) consists in the assignment of tasks to operators engaged ...
Part 1: Sustainable ProductionInternational audienceIn this paper, we propose a mathematical optimis...
In this thesis, we define a new problem area for assembly lines. In the literature, there are variou...
A production system which consists of a number of parallel assembly lines is considered. On each lin...
The simple assembly line balancing problem type E (abbreviated as SALBP-E) occurs when the number of...