Material wastage on construction sites can contribute to cost overruns. Research to provide evidence of the extent of material wastages’ contribution to cost overruns on construction sites is based mostly on surveys. Thus, the actual contribution is not yet ascertained. The purpose of this article is to report the results of an objectively investigated study on the contributions of material waste to project-cost overrun. The methodological approach adopted for the study is the quantitative technique that is rooted in the positivist paradigm. The investigation included ongoing building construction projects within Abuja, Nigeria, from which a sample of 31 public and private projects was purposefully selected (project value of ₦1.6 billion Na...
Ineffective planning and control of materials on sites can degenerate to poor performance and undesi...
The cost of construction material in a construction project may range from 30 – 80 % of total const...
Construction material waste has both environmental and cost performance consequences. In this period...
Material waste and cost overrun have been identified as common problems in the construction industry...
While wastage of materials has become a serious problem requiring urgent attention in the Nigerian C...
The total amount of cost overruns for any construction project can be fully determined once the proj...
It is believed that building material wastage on construction sites account for cost overruns and an...
This research paper evaluates the causes of construction waste generation on building sites in River...
Effective materials management on construction sites is handled carelessly by construction practitio...
Ineffective planning and control of materials on sites can degenerate to poor performance and undesi...
Material waste production on construction sites is related to quantity of building materials leftove...
The causes of construction waste (CW) in Nigeria have been a major topic for researchers over the la...
Nigeria generated over 40 million tonnes of waste between the years 2005 to 2010, while construction...
Improper control of materials during different stages of construction has caused waste and associate...
Abstract: The construction industry is an important investment-led and dynamic sector that contribut...
Ineffective planning and control of materials on sites can degenerate to poor performance and undesi...
The cost of construction material in a construction project may range from 30 – 80 % of total const...
Construction material waste has both environmental and cost performance consequences. In this period...
Material waste and cost overrun have been identified as common problems in the construction industry...
While wastage of materials has become a serious problem requiring urgent attention in the Nigerian C...
The total amount of cost overruns for any construction project can be fully determined once the proj...
It is believed that building material wastage on construction sites account for cost overruns and an...
This research paper evaluates the causes of construction waste generation on building sites in River...
Effective materials management on construction sites is handled carelessly by construction practitio...
Ineffective planning and control of materials on sites can degenerate to poor performance and undesi...
Material waste production on construction sites is related to quantity of building materials leftove...
The causes of construction waste (CW) in Nigeria have been a major topic for researchers over the la...
Nigeria generated over 40 million tonnes of waste between the years 2005 to 2010, while construction...
Improper control of materials during different stages of construction has caused waste and associate...
Abstract: The construction industry is an important investment-led and dynamic sector that contribut...
Ineffective planning and control of materials on sites can degenerate to poor performance and undesi...
The cost of construction material in a construction project may range from 30 – 80 % of total const...
Construction material waste has both environmental and cost performance consequences. In this period...