This paper addresses the flexible manufacturing system (FMS) problems considering both machines and automated guided vehicles (AGVs), simultaneously. A new fuzzy heuristic (FH) is proposed for solving the simultaneous scheduling problem, in order to minimize the makespan by considering the available resources. For increasing the performance of FMS one of the important factors is scheduling AGV with an integral part of the machine scheduling activity. The algorithm is tested based on 82 benchmark problems and the achieved makespan are compared with other algorithms
AGV-based automated guided vehicles (AGVs) are used in the Flexible Manufacturing System (FMS), whic...
This paper presents a new algorithm for the flexible manufacturing system (FMS) scheduling problem. ...
In a flexible manufacturing system (FMS) scheduling problems become extremely complex, even for simp...
AbstractThis paper is concerned with scheduling in Flexible Manufacturing Systems (FMS) using a Fuzz...
The current trend in manufacturing technology is considered by two main items automation andflexibil...
Flexible manufacturing system (FMS) has been introduced by the researchers as an integrated manufac...
An efficient and optimized Automated Guided Vehicles (AGVs) operation plays a critical role in impr...
This paper addresses the scheduling of machines, an Automated Guided Vehicle (AGV) and two robots in...
Automated Guided Vehicles (AGVs) are among various advanced material handling techniques that are fin...
The complete scheduling of FMS includes two independent processes: sequencing of jobs and scheduling...
published_or_final_versionIndustrial and Manufacturing Systems EngineeringDoctoralDoctor of Philosop...
The real-time scheduling of automatic guided vehicles (AGVs) in flexible manufacturing system (FMS) ...
The dynamic continues trend of adoption and improvement inventive automated technologies is one of t...
Flexible Manufacturing System (FMS) is a compound system containing essentials like workplac-es, com...
This paper presents a real-time fuzzy expert system to scheduling parts for a flexible manufacturing...
AGV-based automated guided vehicles (AGVs) are used in the Flexible Manufacturing System (FMS), whic...
This paper presents a new algorithm for the flexible manufacturing system (FMS) scheduling problem. ...
In a flexible manufacturing system (FMS) scheduling problems become extremely complex, even for simp...
AbstractThis paper is concerned with scheduling in Flexible Manufacturing Systems (FMS) using a Fuzz...
The current trend in manufacturing technology is considered by two main items automation andflexibil...
Flexible manufacturing system (FMS) has been introduced by the researchers as an integrated manufac...
An efficient and optimized Automated Guided Vehicles (AGVs) operation plays a critical role in impr...
This paper addresses the scheduling of machines, an Automated Guided Vehicle (AGV) and two robots in...
Automated Guided Vehicles (AGVs) are among various advanced material handling techniques that are fin...
The complete scheduling of FMS includes two independent processes: sequencing of jobs and scheduling...
published_or_final_versionIndustrial and Manufacturing Systems EngineeringDoctoralDoctor of Philosop...
The real-time scheduling of automatic guided vehicles (AGVs) in flexible manufacturing system (FMS) ...
The dynamic continues trend of adoption and improvement inventive automated technologies is one of t...
Flexible Manufacturing System (FMS) is a compound system containing essentials like workplac-es, com...
This paper presents a real-time fuzzy expert system to scheduling parts for a flexible manufacturing...
AGV-based automated guided vehicles (AGVs) are used in the Flexible Manufacturing System (FMS), whic...
This paper presents a new algorithm for the flexible manufacturing system (FMS) scheduling problem. ...
In a flexible manufacturing system (FMS) scheduling problems become extremely complex, even for simp...