Material waste and cost overrun have been identified as common problems in the construction industry. These problems occur at both pre- and post-contract stages of a construction project. As a result of a dearth of empirical research and low level of awareness, the majority of managers of construction projects in Nigeria pay hardly any attention to material waste issues that affect cost overrun. This article examines the material waste issues that affect cost overruns at the post-contract stage of building projects. The study covers building construction projects in Abuja, Nigeria. In-depth interviews were conducted with professionals using purposive sampling technique. It is purposive, because only building professionals handling projects ...
The causes of construction waste (CW) in Nigeria have been a major topic for researchers over the la...
PurposeThis paper aims to assess the level of awareness of quantity surveyors in material management...
Nigeria generated over 40 million tonnes of waste between the years 2005 to 2010, while construction...
Material waste and cost overrun have been identified as common problems in the construction industry...
Material wastage on construction sites can contribute to cost overruns. Research to provide evidence...
While wastage of materials has become a serious problem requiring urgent attention in the Nigerian C...
Effective materials management on construction sites is handled carelessly by construction practitio...
The total amount of cost overruns for any construction project can be fully determined once the proj...
Material waste production on construction sites is related to quantity of building materials leftove...
Improper control of materials during different stages of construction has caused waste and associate...
Ineffective planning and control of materials on sites can degenerate to poor performance and undesi...
This research paper evaluates the causes of construction waste generation on building sites in River...
It is believed that building material wastage on construction sites account for cost overruns and an...
The cost of construction material in a construction project may range from 30 – 80 % of total const...
The paper considers the management of materials on building construction sites. In the study, method...
The causes of construction waste (CW) in Nigeria have been a major topic for researchers over the la...
PurposeThis paper aims to assess the level of awareness of quantity surveyors in material management...
Nigeria generated over 40 million tonnes of waste between the years 2005 to 2010, while construction...
Material waste and cost overrun have been identified as common problems in the construction industry...
Material wastage on construction sites can contribute to cost overruns. Research to provide evidence...
While wastage of materials has become a serious problem requiring urgent attention in the Nigerian C...
Effective materials management on construction sites is handled carelessly by construction practitio...
The total amount of cost overruns for any construction project can be fully determined once the proj...
Material waste production on construction sites is related to quantity of building materials leftove...
Improper control of materials during different stages of construction has caused waste and associate...
Ineffective planning and control of materials on sites can degenerate to poor performance and undesi...
This research paper evaluates the causes of construction waste generation on building sites in River...
It is believed that building material wastage on construction sites account for cost overruns and an...
The cost of construction material in a construction project may range from 30 – 80 % of total const...
The paper considers the management of materials on building construction sites. In the study, method...
The causes of construction waste (CW) in Nigeria have been a major topic for researchers over the la...
PurposeThis paper aims to assess the level of awareness of quantity surveyors in material management...
Nigeria generated over 40 million tonnes of waste between the years 2005 to 2010, while construction...