Study region: The Kinu River basin receiving serious damage in September 2015 because of the heavy rainfall disaster that hit the districts of Kanto and Tohoku in Japan. Study focus: This paper provides future flood risk management for floods that exceed design levels (FEDL) based on past flood control systems and land use considering the natural topography in the area that was inundated by flood water from the Kinu River. New hydrological insights for the region: The results of the literature research reveal flood management methods for preventing inundation of the city of Mitsukaido, such as drainage using a discontinuous embankment and a low-lying backswamp. In addition, the areas inundated by this flood were mainly those around a high-a...
This study shows the overview of the risk-based floodplain regulation implemented by the Shiga Prefe...
Abstract: The tsunami caused by the Great East Japan Earthquake on 11 March 2011, with a magnitude o...
The Ministry of Construction has already undertaken a policy, including the Comprehensive Flood Cont...
Flooding is a normal and naturally occurring phenomenon. Past experience have shown that large inves...
AbstractOn September 9, 2015, typhoon number 18 brought unprecedented rainfall to northern Japan, pa...
Japanese river improvement works on flood control have mainly been conducted by the Japanese Governm...
Flooding is a normal and naturally occurring phenomenon. Past experience have shown that large inves...
Field survey on the flood and sediment disaster which was happen in Tokachi and Tokoro River Basins ...
Heavy rainfall caused severe flood disasters across the western Japan in July 2018. In order to decr...
Kanto-Tohoku heavy rainfall in September 2015 caused a severe flood disaster at the downstream of th...
Erosional and sedimentary features associated with flooding have been documented in both modern and ...
The River Act was amended in 1997 in order to add flood-restraining forest belts, which allow a floo...
An open levee system is a traditional flood mitigation system for reducing the expansion of inland f...
AbstractOn September 9, 2015, typhoon number 18 brought unprecedented rainfall to northern Japan, pa...
Flood is an overflow of water that submerges land which is usually dry. It also defines as a coverin...
This study shows the overview of the risk-based floodplain regulation implemented by the Shiga Prefe...
Abstract: The tsunami caused by the Great East Japan Earthquake on 11 March 2011, with a magnitude o...
The Ministry of Construction has already undertaken a policy, including the Comprehensive Flood Cont...
Flooding is a normal and naturally occurring phenomenon. Past experience have shown that large inves...
AbstractOn September 9, 2015, typhoon number 18 brought unprecedented rainfall to northern Japan, pa...
Japanese river improvement works on flood control have mainly been conducted by the Japanese Governm...
Flooding is a normal and naturally occurring phenomenon. Past experience have shown that large inves...
Field survey on the flood and sediment disaster which was happen in Tokachi and Tokoro River Basins ...
Heavy rainfall caused severe flood disasters across the western Japan in July 2018. In order to decr...
Kanto-Tohoku heavy rainfall in September 2015 caused a severe flood disaster at the downstream of th...
Erosional and sedimentary features associated with flooding have been documented in both modern and ...
The River Act was amended in 1997 in order to add flood-restraining forest belts, which allow a floo...
An open levee system is a traditional flood mitigation system for reducing the expansion of inland f...
AbstractOn September 9, 2015, typhoon number 18 brought unprecedented rainfall to northern Japan, pa...
Flood is an overflow of water that submerges land which is usually dry. It also defines as a coverin...
This study shows the overview of the risk-based floodplain regulation implemented by the Shiga Prefe...
Abstract: The tsunami caused by the Great East Japan Earthquake on 11 March 2011, with a magnitude o...
The Ministry of Construction has already undertaken a policy, including the Comprehensive Flood Cont...