To predict the penetration depth of the offshore jack-up drilling platform during the preloading process, the fluid-solid coupling theory was introduced to establish the finite element model of the soil-spudcan system in saturated clay. With this model, the spudcan bearing capacity factor was numerically calculated when spudcans penetrated into homogeneous and heterogeneous clay. The results show that, the spudcan bearing capacity factor is mainly decided by soil strength and spudcan penetration depth: for soil with lower strength heterogeneous coefficient, the spudcan bearing factor has a positive correlation with the spudcan penetration depth, while for soil with higher strength heterogeneous coefficients, the correlation is negative. Whe...
During offshore operations, the spudcan footings of mobile jack-ups are subjected to combined vertic...
Analysis on the sliding risk of jack-up platform re-installation close to the existing footprint is ...
The foundations of offshore mobile jack-up drilling rigs are subject to combined vertical (V), horiz...
To compare the bearing capacities of the traditional spudcan and the bucket spudcan, the effects of ...
A numerical model for jack-up penetration process was built based on the geotechnical centrifugal mo...
Mobile jack-up drilling rigs are typically supported by individual, large diameter spudcan foundatio...
Mobile jack-up rigs are widely used in offshore oil and gas exploration and increasingly in temporar...
Spudcans are a type of foundation for mobile jack-up rigs and are connected to each ...
Installing jack-up spudcan foundations in layered seabed is still challenging in the offshore indust...
As the demand for renewable energy is constantly rising, more offshore wind farms are being built at...
There has been a constant trend towards larger mobile jack-ups capable of operating for extended per...
All dimensions are approximate The vertical penetration of spudcan foundations, as used in mobile ja...
The rapid penetration of one or more of the foundations of a mobile jack-up rig into the seabed is a...
The bearing capacity envelopes for a spudcan foundation in single layer sand or clay soil are well-d...
Punch-through failure of jack-up spudcan foundations occurs in active oil and gas drilling explorati...
During offshore operations, the spudcan footings of mobile jack-ups are subjected to combined vertic...
Analysis on the sliding risk of jack-up platform re-installation close to the existing footprint is ...
The foundations of offshore mobile jack-up drilling rigs are subject to combined vertical (V), horiz...
To compare the bearing capacities of the traditional spudcan and the bucket spudcan, the effects of ...
A numerical model for jack-up penetration process was built based on the geotechnical centrifugal mo...
Mobile jack-up drilling rigs are typically supported by individual, large diameter spudcan foundatio...
Mobile jack-up rigs are widely used in offshore oil and gas exploration and increasingly in temporar...
Spudcans are a type of foundation for mobile jack-up rigs and are connected to each ...
Installing jack-up spudcan foundations in layered seabed is still challenging in the offshore indust...
As the demand for renewable energy is constantly rising, more offshore wind farms are being built at...
There has been a constant trend towards larger mobile jack-ups capable of operating for extended per...
All dimensions are approximate The vertical penetration of spudcan foundations, as used in mobile ja...
The rapid penetration of one or more of the foundations of a mobile jack-up rig into the seabed is a...
The bearing capacity envelopes for a spudcan foundation in single layer sand or clay soil are well-d...
Punch-through failure of jack-up spudcan foundations occurs in active oil and gas drilling explorati...
During offshore operations, the spudcan footings of mobile jack-ups are subjected to combined vertic...
Analysis on the sliding risk of jack-up platform re-installation close to the existing footprint is ...
The foundations of offshore mobile jack-up drilling rigs are subject to combined vertical (V), horiz...