This study aims to deal with a more realistic combined problem of project scheduling and material ordering. The goal is to minimize the total material holding and ordering costs by determining the starting time of activities along with material ordering schedules subject to some constraints. The problem is first mathematically modelled. Then a hybrid simulated annealing and genetic algorithm is proposed tosolve it. In addition, some experiments are designed and the Taguchi method is employed to both tune the parameters of the proposed algorithm and to evaluate its performance. The results of the performance analysis show the efficiency of the proposed methodology
Project scheduling models with resource constraints and multi-mode activities aims to create a sched...
This study developed a mathematical model to optimize multi-mode resource-constrained project schedu...
In this study, the integration of total quantity discount policy in materials procurement of a proje...
Traditionally, project scheduling and material planning have been treated independently. In this res...
Concurrent planning of the resource constraint project scheduling and material ordering problems hav...
This study emphasizes that project scheduling and material ordering (time and quantity of an order) ...
Ovaj rad predstavlja hibridni genetski algoritam za problem programiranja kod montaže na tekućoj tra...
Resource-constrained project scheduling problem (RCPSP) is a very important optimization problem in ...
This paper investigates the problem of selecting and scheduling a set of projects among available pr...
In this paper, a multi-objective project scheduling problem is addressed. This problem considers two...
This article considers the multicriteria optimization approach using the modified genetic algorithm ...
Minimizing the costs in a project is highly tied with the way the required resources are provided. T...
<p>Simultaneous planning of project scheduling and material procurement can improve the project exec...
In this thesis, meta-heuristic algorithms are developed to obtain optimum or near optimum solutions ...
In this paper, we address a project scheduling problem that considers a priority optimization object...
Project scheduling models with resource constraints and multi-mode activities aims to create a sched...
This study developed a mathematical model to optimize multi-mode resource-constrained project schedu...
In this study, the integration of total quantity discount policy in materials procurement of a proje...
Traditionally, project scheduling and material planning have been treated independently. In this res...
Concurrent planning of the resource constraint project scheduling and material ordering problems hav...
This study emphasizes that project scheduling and material ordering (time and quantity of an order) ...
Ovaj rad predstavlja hibridni genetski algoritam za problem programiranja kod montaže na tekućoj tra...
Resource-constrained project scheduling problem (RCPSP) is a very important optimization problem in ...
This paper investigates the problem of selecting and scheduling a set of projects among available pr...
In this paper, a multi-objective project scheduling problem is addressed. This problem considers two...
This article considers the multicriteria optimization approach using the modified genetic algorithm ...
Minimizing the costs in a project is highly tied with the way the required resources are provided. T...
<p>Simultaneous planning of project scheduling and material procurement can improve the project exec...
In this thesis, meta-heuristic algorithms are developed to obtain optimum or near optimum solutions ...
In this paper, we address a project scheduling problem that considers a priority optimization object...
Project scheduling models with resource constraints and multi-mode activities aims to create a sched...
This study developed a mathematical model to optimize multi-mode resource-constrained project schedu...
In this study, the integration of total quantity discount policy in materials procurement of a proje...