Research Question: This paper investigates whether the Monte Carlo simulation can be widely used as a practicable method for the analysis of the risks that impact project duration. Motivation: The main goal was to explore the use of the Monte Carlo simulation for project time management, and shed some light on the key benefits and drawbacks of this method. The paper reviewed the existing literature considering traditional use of the Monte Carlo for quantitative project risk analysis (such as Kwak & Ingall, 2007; Hulett, 2017) and elaborated the issue by suggesting potential improvements in terms of method modification for schedule management, such as event chain methodology proposed by Agarwal & Virine (2017). Another goal was to examine th...
The article describes the Monte-Carlo simulation method for project risk management. The method incl...
The increasing organizational complexity and competitiveness in industry is driving the interest in ...
This paper gives an overview of three simulation studies in dynamic project scheduling integrating b...
Risk and uncertainty are factors that construction project managers have been increasingly had to de...
The purpose of this paper is to give an overview on the existing literature and recent developments ...
AbstractIt is well known the potential and the convenience of using Monte Carlo (MC) simulation to f...
Monte Carlo simulation is a useful technique for modeling and analyzing real-world systems and situa...
Construction project scheduling and monitoring is challenging in today's very dynamic business envir...
This paper presents a spreadsheet-based simulation model for analyzing project time management using...
PERT (Program Evaluation and Review Technique), developed in the 1950’s, represented the ...
There is a broad category of Operations Management problems having to do with the management of proj...
This research aims to evaluate the effectiveness of implementing quantitative techniques to improve ...
The main objective of this thesis was to identify potential improvements of the risk management proc...
AbstractThe continuous growth of the challenges and the complexity of projects, lead to the developm...
The objective of this paper is to unveil the relevance of Monte Carlo critical path analysis in reso...
The article describes the Monte-Carlo simulation method for project risk management. The method incl...
The increasing organizational complexity and competitiveness in industry is driving the interest in ...
This paper gives an overview of three simulation studies in dynamic project scheduling integrating b...
Risk and uncertainty are factors that construction project managers have been increasingly had to de...
The purpose of this paper is to give an overview on the existing literature and recent developments ...
AbstractIt is well known the potential and the convenience of using Monte Carlo (MC) simulation to f...
Monte Carlo simulation is a useful technique for modeling and analyzing real-world systems and situa...
Construction project scheduling and monitoring is challenging in today's very dynamic business envir...
This paper presents a spreadsheet-based simulation model for analyzing project time management using...
PERT (Program Evaluation and Review Technique), developed in the 1950’s, represented the ...
There is a broad category of Operations Management problems having to do with the management of proj...
This research aims to evaluate the effectiveness of implementing quantitative techniques to improve ...
The main objective of this thesis was to identify potential improvements of the risk management proc...
AbstractThe continuous growth of the challenges and the complexity of projects, lead to the developm...
The objective of this paper is to unveil the relevance of Monte Carlo critical path analysis in reso...
The article describes the Monte-Carlo simulation method for project risk management. The method incl...
The increasing organizational complexity and competitiveness in industry is driving the interest in ...
This paper gives an overview of three simulation studies in dynamic project scheduling integrating b...