To seek effective ways of lowering development cost and tapping inter-well remaining reserves, sidetracking horizontal wells from old wells in Su10 and Su53 Block were conducted. The engineering and geological problems such as leakage, collapse and sticking in slim-hole sidetracking, and difficult evaluation of remaining gas were gradually overcome, and a set of drilling and completion technology, well deployment optimization technology and geo-steering technology suitable for sidetracking horizontal wells in tight sandstone gas reservoirs have been worked out. By making full use of the old well, sidetracking horizontal wells can greatly reduce development costs, enhance the producing degree of inter-well remaining reserves, and get product...
The flexible drilling method of ultra-short radius sidetrack horizontal wells is an effective method...
The flexible drilling method of ultra-short radius sidetrack horizontal wells is an effective method...
During the winter of 1990 to 1991, the Department of Energy evaluated several options to completing ...
© 2019, International Multidisciplinary Scientific Geoconference. All rights reserved. This paper di...
© 2019, International Multidisciplinary Scientific Geoconference. All rights reserved. This paper di...
The boreholes of the horizontal side-drilled wells with casing windows in Changqing Oilfield are all...
By virtue of unique technical and economical advantages, horizontal well development has become a ke...
AbstractBy virtue of unique technical and economical advantages, horizontal well development has bec...
AbstractBased on the exploration and development achievements of the Sulige Gasfield in the Ordos Ba...
AbstractSu Lige gas field is a large gas field which is discovered in China in recent years. It has ...
Based on the exploration and development achievements of the Sulige Gasfield in the Ordos Basin, tig...
Sulige gas field is a typical tight sand gas field in China. Well type and pattern optimization is t...
Aimed at the development situation for horizontal wells in low permeability reservoirs in the Jilin ...
The flexible drilling method of ultra-short radius sidetrack horizontal wells is an effective method...
With the basic characteristics of conventional horizontal wells, the so-called complex wells includi...
The flexible drilling method of ultra-short radius sidetrack horizontal wells is an effective method...
The flexible drilling method of ultra-short radius sidetrack horizontal wells is an effective method...
During the winter of 1990 to 1991, the Department of Energy evaluated several options to completing ...
© 2019, International Multidisciplinary Scientific Geoconference. All rights reserved. This paper di...
© 2019, International Multidisciplinary Scientific Geoconference. All rights reserved. This paper di...
The boreholes of the horizontal side-drilled wells with casing windows in Changqing Oilfield are all...
By virtue of unique technical and economical advantages, horizontal well development has become a ke...
AbstractBy virtue of unique technical and economical advantages, horizontal well development has bec...
AbstractBased on the exploration and development achievements of the Sulige Gasfield in the Ordos Ba...
AbstractSu Lige gas field is a large gas field which is discovered in China in recent years. It has ...
Based on the exploration and development achievements of the Sulige Gasfield in the Ordos Basin, tig...
Sulige gas field is a typical tight sand gas field in China. Well type and pattern optimization is t...
Aimed at the development situation for horizontal wells in low permeability reservoirs in the Jilin ...
The flexible drilling method of ultra-short radius sidetrack horizontal wells is an effective method...
With the basic characteristics of conventional horizontal wells, the so-called complex wells includi...
The flexible drilling method of ultra-short radius sidetrack horizontal wells is an effective method...
The flexible drilling method of ultra-short radius sidetrack horizontal wells is an effective method...
During the winter of 1990 to 1991, the Department of Energy evaluated several options to completing ...