In this paper, a new probability mechanism based particle swarm optimization (PMPSO) algorithm is proposed to solve combinatorial optimization problems. Based on the idea of traditional PSO, the algorithm generates new particles based on the optimal particles in the population and the historical optimal particles in the individual changes. In our algorithm, new particles are generated by a specially designed probability selection mechanism. We adjust the probability of each child element in the new particle generation based on the difference between the best particles and the elements of each particle. To this end, we redefine the speed, position, and arithmetic symbols in the PMPSO algorithm. To test the performance of PMPSO, we used PMPSO...
Particle Swarm Optimization (PSO) is a population-based metaheuristic that was modelled based on the...
Abstract This paper presents use of Particle Swarm Optimization (PSO) algorithm introduced by Kenned...
which permits unrestricted use, distribution, and reproduction in any medium, provided the original ...
This paper presents a Particle SwarmOptimization (PSO) algorithm for solving Resource-Constrained Pr...
We study a resource-constrained project scheduling problem in a hazardous environment considering so...
Nowadays scheduling problems are raised in areas like industry, academic, health care, production an...
Nowadays scheduling problems are raised in areas like industry, academic, health care, production an...
This paper introduces the particle swarm optimization (PSO)-based approach to resolve the resource-c...
Copyright © 2013 Ruochen Liu et al. This is an open access article distributed under the Creative Co...
AbstractThis paper is regarding the Particle Swarm Optimization (PSO)-based approach for the solutio...
The multimode resource-constrained project scheduling problem (MRCPSP) has been confirmed to be an N...
This paper explores the behavior of the Flower Pollination Algorithm (FPA) and Particle Swarm Optimi...
Many machinery manufacturings are categorized as multi-mode resource-constrained project scheduling ...
Resource-Constrained Project Scheduling Problems (RCPSP) is one of the most intractable optimization...
The multimode resource-constrained projectscheduling problem (MRCPSP) considers both renewable and n...
Particle Swarm Optimization (PSO) is a population-based metaheuristic that was modelled based on the...
Abstract This paper presents use of Particle Swarm Optimization (PSO) algorithm introduced by Kenned...
which permits unrestricted use, distribution, and reproduction in any medium, provided the original ...
This paper presents a Particle SwarmOptimization (PSO) algorithm for solving Resource-Constrained Pr...
We study a resource-constrained project scheduling problem in a hazardous environment considering so...
Nowadays scheduling problems are raised in areas like industry, academic, health care, production an...
Nowadays scheduling problems are raised in areas like industry, academic, health care, production an...
This paper introduces the particle swarm optimization (PSO)-based approach to resolve the resource-c...
Copyright © 2013 Ruochen Liu et al. This is an open access article distributed under the Creative Co...
AbstractThis paper is regarding the Particle Swarm Optimization (PSO)-based approach for the solutio...
The multimode resource-constrained project scheduling problem (MRCPSP) has been confirmed to be an N...
This paper explores the behavior of the Flower Pollination Algorithm (FPA) and Particle Swarm Optimi...
Many machinery manufacturings are categorized as multi-mode resource-constrained project scheduling ...
Resource-Constrained Project Scheduling Problems (RCPSP) is one of the most intractable optimization...
The multimode resource-constrained projectscheduling problem (MRCPSP) considers both renewable and n...
Particle Swarm Optimization (PSO) is a population-based metaheuristic that was modelled based on the...
Abstract This paper presents use of Particle Swarm Optimization (PSO) algorithm introduced by Kenned...
which permits unrestricted use, distribution, and reproduction in any medium, provided the original ...