Abstract The cost for locomotive distribution over the rail yards to meet the locomotive demand for train formation is very high. Thus, this paper proposes a mathematical model based on the Locomotive Scheduling Problem for locomotive distribution planning to meet the demand of the rail yards seeking to minimize the distribution costs. The proposed model presents a new formulation for the LSP with Multiple Locomotives and considers the imbalance between offer and demand of locomotives, this situation was not addressed in the literature yet. Tests on instances based on real data from the Vitória a Minas Railroad (EFVM) were solved optimally using CPLEX 12.6. The model proved to be a good tool to analyze the locomotive distribution planning. ...
In this study, a mathematical programming model for the tactical planning of freight railways, which...
Given a periodic train schedule and a fleet composed of several types of equipment, the simultaneous...
The article discusses the issue of effective distribution of work on formation of train network betw...
In this paper, the authors develop new formulations for the locomotive planning problem (LPP) which ...
The locomotive scheduling problem (or the locomotive assignment problem) is to assign a consist (a ...
The locomotive assignment problem involves assigning a set of locomotives to each train in a pre-pla...
In the North America railroad network, thousands of locomotives are running everyday and they are in...
The considered problem consists in optimizing the refueling costs of a fleet of locomotives over a r...
Intention– Cyclic locomotive assignment planning is a specific type of organization of locomotive us...
Optimization of rail transport is complex because of the industry’s multiple constraints. The transp...
A multi-class single locomotive (MCSL) problem is defined in this paper as one involving the allocat...
The attendance of the demand for freight transport is related to the process of allocation of the wa...
This paper considers mathematical optimization for the multistage train formation problem, which at ...
A locomotive assignment is one of the subproblems in railway scheduling domain. In this report prese...
Determination of fleet size of locomotives and of a policy to deadhead them are tactical issues that...
In this study, a mathematical programming model for the tactical planning of freight railways, which...
Given a periodic train schedule and a fleet composed of several types of equipment, the simultaneous...
The article discusses the issue of effective distribution of work on formation of train network betw...
In this paper, the authors develop new formulations for the locomotive planning problem (LPP) which ...
The locomotive scheduling problem (or the locomotive assignment problem) is to assign a consist (a ...
The locomotive assignment problem involves assigning a set of locomotives to each train in a pre-pla...
In the North America railroad network, thousands of locomotives are running everyday and they are in...
The considered problem consists in optimizing the refueling costs of a fleet of locomotives over a r...
Intention– Cyclic locomotive assignment planning is a specific type of organization of locomotive us...
Optimization of rail transport is complex because of the industry’s multiple constraints. The transp...
A multi-class single locomotive (MCSL) problem is defined in this paper as one involving the allocat...
The attendance of the demand for freight transport is related to the process of allocation of the wa...
This paper considers mathematical optimization for the multistage train formation problem, which at ...
A locomotive assignment is one of the subproblems in railway scheduling domain. In this report prese...
Determination of fleet size of locomotives and of a policy to deadhead them are tactical issues that...
In this study, a mathematical programming model for the tactical planning of freight railways, which...
Given a periodic train schedule and a fleet composed of several types of equipment, the simultaneous...
The article discusses the issue of effective distribution of work on formation of train network betw...