Supporting Facilities and Infrastructures Development Project of Folder Air Hitam Samarinda is realized by PT. Trinanda Karya Utama. This project has a possibility of retardation, so it results to the retardation of other activities. One of the ways to anticipate it by conducting acceleration which is by Time Cost Trade Off (TCTO) method through alternative of adding working hours in the trial ranging from 1 hour to 4 hours at maximum limit. It aims to analyze the time and cost needed by the implementation of TCTO in completing the development of Supporting Facilities and Infrastructure of Folder Air Hitam Samarinda. In realizing the design of the acceleration, it is started from the network creation of Critical Path Method (CPM) to ...
Time-Cost Trade-Off Problem (TCTP), to determine optimal option among many options of construction w...
Cost and time control is a key aspect of construction management. In its planning, both aspects need...
This study focuses on the remaining work at stations (STA) 53+950 to 54+550 in Jakarta – Cikampek II...
Supporting Facilities and Infrastructures Development Project of Folder Air Hitam Samarinda is real...
Time and cost analyzes were conducted in this research; which were required in the application of T...
The implementation of a construction project can be affected by a variety of factors, which might le...
Achmad Febrian Hermawan, 2017. Optimasi Penjadwalan Pelaksanaan Proyek Pembangunan Fasilitas Dan Sa...
Various things can occur in the implementation of a construction project that could lead an increase...
CV. ABP a construction company worked in infrastructure building development for private and goverme...
During the execution of construction projects, often there is a mismatch between the planned schedul...
Along with the rapid development of the times which also has an impact on the rapid development of ...
Along with the development era, more and more construction projects are built to meet all human need...
Execution of a construction project requires a systematic and well-planned scheduling so that the pr...
A construction company in Karangpilang received a Pressure Vessel project. This project is delayed f...
Planning is the most significant part to achieve success of construction project. The planning itsel...
Time-Cost Trade-Off Problem (TCTP), to determine optimal option among many options of construction w...
Cost and time control is a key aspect of construction management. In its planning, both aspects need...
This study focuses on the remaining work at stations (STA) 53+950 to 54+550 in Jakarta – Cikampek II...
Supporting Facilities and Infrastructures Development Project of Folder Air Hitam Samarinda is real...
Time and cost analyzes were conducted in this research; which were required in the application of T...
The implementation of a construction project can be affected by a variety of factors, which might le...
Achmad Febrian Hermawan, 2017. Optimasi Penjadwalan Pelaksanaan Proyek Pembangunan Fasilitas Dan Sa...
Various things can occur in the implementation of a construction project that could lead an increase...
CV. ABP a construction company worked in infrastructure building development for private and goverme...
During the execution of construction projects, often there is a mismatch between the planned schedul...
Along with the rapid development of the times which also has an impact on the rapid development of ...
Along with the development era, more and more construction projects are built to meet all human need...
Execution of a construction project requires a systematic and well-planned scheduling so that the pr...
A construction company in Karangpilang received a Pressure Vessel project. This project is delayed f...
Planning is the most significant part to achieve success of construction project. The planning itsel...
Time-Cost Trade-Off Problem (TCTP), to determine optimal option among many options of construction w...
Cost and time control is a key aspect of construction management. In its planning, both aspects need...
This study focuses on the remaining work at stations (STA) 53+950 to 54+550 in Jakarta – Cikampek II...