This report represents deliverable D5.2 Ed.2 'Safety and Robustness Analysis' of the R-WAKE projectand is part of WP5 (Simulation and Analysis) and has the objective to provide an evidence-basedproposal for either maintaining current separations, or adopting new potential separation schemes,that is, the R-WAKE Concept(s) to be further investigated. The R-WAKE project addresses the SESAR 2020 Exploratory Research work-programme topic ER-07-2015 - Separation Management and Separation Standards, within the area of Advanced Air Traffic Services (ATS). The R-WAKE project overall objective is to investigate the risks and hazards of potential wake vortex encounters in the En-route airspace, in current and futuristic operational scenarios, in orde...
With the steady increase in air traffic, civil aviation authorities are under continuous pressure t...
With the steady increase in air traffic, the aviation system is under continuous pressure to increas...
Key words: wake turbulence, wake vortices, probabilistic safety assessment Abstract: Vortices behind...
This report represents deliverable D5.2 Ed.2 'Safety and Robustness Analysis' of the R-WAKE projecta...
This report is the Deliverable 4.1 R-WAKE Release 1 Document, resulting from half of WP4 activities....
This report is the Deliverable 3 . 1 R - WAKE System Design Document , resulting from WP3 activities...
This report represents deliverable D4.2 “System Release 2” of the R-WAKE project, which describes th...
This REPORT is part of a project that has received funding from the SESAR Joint Undertaking under g...
This REPORT is part of a project that has received funding from the SESAR Joint Undertaking under g...
The work presented in this paper was partially funded by the SESAR Joint Undertaking under grant agr...
This report is Deliverable 2.3 Scenario Definition Document of the R-Wake project, resulting from W...
Best of Session (ATM-I: Weather Impact Assessment) Award, 2018; Premi al millor article de la Sessió...
In the framework of internal, national and European projects DLR has an extensive history in the fie...
This report is the Deliverable 2.1 R-WAKE System Specification Document, which provides t...
The complex physical process of the wake vortex encounter (WVE) mechanism - from vortex generation t...
With the steady increase in air traffic, civil aviation authorities are under continuous pressure t...
With the steady increase in air traffic, the aviation system is under continuous pressure to increas...
Key words: wake turbulence, wake vortices, probabilistic safety assessment Abstract: Vortices behind...
This report represents deliverable D5.2 Ed.2 'Safety and Robustness Analysis' of the R-WAKE projecta...
This report is the Deliverable 4.1 R-WAKE Release 1 Document, resulting from half of WP4 activities....
This report is the Deliverable 3 . 1 R - WAKE System Design Document , resulting from WP3 activities...
This report represents deliverable D4.2 “System Release 2” of the R-WAKE project, which describes th...
This REPORT is part of a project that has received funding from the SESAR Joint Undertaking under g...
This REPORT is part of a project that has received funding from the SESAR Joint Undertaking under g...
The work presented in this paper was partially funded by the SESAR Joint Undertaking under grant agr...
This report is Deliverable 2.3 Scenario Definition Document of the R-Wake project, resulting from W...
Best of Session (ATM-I: Weather Impact Assessment) Award, 2018; Premi al millor article de la Sessió...
In the framework of internal, national and European projects DLR has an extensive history in the fie...
This report is the Deliverable 2.1 R-WAKE System Specification Document, which provides t...
The complex physical process of the wake vortex encounter (WVE) mechanism - from vortex generation t...
With the steady increase in air traffic, civil aviation authorities are under continuous pressure t...
With the steady increase in air traffic, the aviation system is under continuous pressure to increas...
Key words: wake turbulence, wake vortices, probabilistic safety assessment Abstract: Vortices behind...