This paper gives an overview of good and bad practice for understanding and curbing cost overrun in large capital investment projects, with a critique of Love and Ahiaga-Dagbui (2018) as point of departure. Good practice entails: (a) Consistent definition and measurement of overrun; in contrast to mixing inconsistent baselines, price levels, etc. (b) Data collection that includes all valid and reliable data; as opposed to including idiosyncratically sampled data, data with removed outliers, non-valid data from consultancies, etc. (c) Recognition that cost overrun is systemically fat-tailed; in contrast to understanding overrun in terms of error and randomness. (d) Acknowledgment that the root cause of cost overrun is behavioral bias; in con...
NoUnderstanding the cause of cost overruns in transportation infrastructure projects has been a top...
In the public arena, we often hear about projects that have suffered massive cost overruns. Often th...
AbstractProject Management and Cost Engineering have made tremendous advances but we still witness a...
This paper gives an overview of good and bad practice for understanding and curbing cost overrun in ...
This paper gives an overview of good and bad practice for understanding and curbing cost overrun in ...
This paper gives an overview of good and bad practice for understanding and curbing cost overrun in ...
Construction projects routinely overrun their cost estimates. A plethora of studies have thus been d...
Civil engineers are often in the firing line for alleged cost overruns, particularly on major public...
Project costs tend to overrun, regardless of the size and type of the project. Research has shown th...
Infrastructure cost overruns receive significant amount of attention in the academic literature as w...
Construction projects routinely overrun their cost estimates. A plethora of studies have thus been d...
Managing large-scale transportation infrastructure projects is difficult due to frequent misinformat...
Despite a growing wealth of experience and knowledge concerning projects they experience cost overru...
Many infrastructure projects have cost overruns and there has been a lot of research both on why the...
Purpose: Drawing on mainstream arguments in the literature, the paper presents a coherent and holist...
NoUnderstanding the cause of cost overruns in transportation infrastructure projects has been a top...
In the public arena, we often hear about projects that have suffered massive cost overruns. Often th...
AbstractProject Management and Cost Engineering have made tremendous advances but we still witness a...
This paper gives an overview of good and bad practice for understanding and curbing cost overrun in ...
This paper gives an overview of good and bad practice for understanding and curbing cost overrun in ...
This paper gives an overview of good and bad practice for understanding and curbing cost overrun in ...
Construction projects routinely overrun their cost estimates. A plethora of studies have thus been d...
Civil engineers are often in the firing line for alleged cost overruns, particularly on major public...
Project costs tend to overrun, regardless of the size and type of the project. Research has shown th...
Infrastructure cost overruns receive significant amount of attention in the academic literature as w...
Construction projects routinely overrun their cost estimates. A plethora of studies have thus been d...
Managing large-scale transportation infrastructure projects is difficult due to frequent misinformat...
Despite a growing wealth of experience and knowledge concerning projects they experience cost overru...
Many infrastructure projects have cost overruns and there has been a lot of research both on why the...
Purpose: Drawing on mainstream arguments in the literature, the paper presents a coherent and holist...
NoUnderstanding the cause of cost overruns in transportation infrastructure projects has been a top...
In the public arena, we often hear about projects that have suffered massive cost overruns. Often th...
AbstractProject Management and Cost Engineering have made tremendous advances but we still witness a...