Trisurya, M.W, 2017. NIT: 50134789 N, “Penanganan Keterlambatan Proses Bongkar Muatan Liquefied Petroleum Gas (LPG) Secara Ship To Ship di Kapal VLGC Pertamina Gas 1”. Nautical Study Program, Diploma IV Program, Merchant Marine Polytechnic of Semarang, 1st Advisor: Capt. Arika Palapa., M.Si., M.Mar. and 2nd Advisor: Tony Santiko S.St., M.Si. VLGC vessel Pertamina Gas 1 is a fully refrigerated type gas vessel designed to transport LPG in large quantities. LPG consists of butane and propane which is a gas charge in liquid form. The process of discharge of LPG cargo on VLGC vessel Pertamina Gas 1 is carried out by ship to ship operation where VLGC vessel Pertamina Gas 1 as mother ship. Based on the results of research from the author...
Desima Ayuningtyas, 2018, NIT: 51145144. N, “Effort to Prevent High Pressure Tank LPG/C Vessel at L...
Abstraksi – MT. Pertamina Gas 1 merupakan kapal tanker pengangkut muatan LPG tipe Fully Refrigerate...
ABSTRAKSI Mitaningrum, Devi, 2023, 561911117068 N, “Analisis Proses Pemuatan Liquefied Petroleum G...
Muhammad Ilham Fatah Arrozaq, 2017, NIT: 50134820.N, “Optimalization Loading Process of Liquefied Pe...
Abstraksi, kapal VLGC Pertamina Gas 1 adalah kapal gas dengan tipe fully refrigerated yang dirancang...
Arti Kusuma Putri, 2018, NIT: 51145208 N, “Manajemen Pergantian Muatan dari Muatan Butadiene ke LPG...
Ira Sigit Pradikta, 2017, NIT: 49124450.N, "Efforts to Reduce Pressure On Cargo Tank In Ship LPG / ...
Abstraksi - LPG kepanjangan dari Liquefied petroleum gas, LPG berbentuk gas yang dicairkan, terdiri ...
Abstraksi - LPG kepanjangan dari Liquefied petroleum gas, LPG berbentuk gas yang dicairkan, terdiri ...
ABSTRACT Mitha Rahmania Pratiwi, 2018, 5145127.N, “Identification cargo handling of LPG utilized re...
ABSTRACT Bagas Prabowo, 2018, 50134742 N, "The handling of loading and unloading LNG (gas methane ...
Sigit Prasetyo, 2017, Minimize LPG cargo leakage at LPG/C vessel – Attaka when discharge in Langkat,...
Dristian Prayogo, 2016, NIT: 49124475.N, “Fire on ship handling Liquefied Petroleum Gas (LPG) Navig...
Agami, Dhimas Panji Gilang. 2016. Handling Influence Temperature Outside On The Process Loading Liqu...
LPG consists of butane and propane, which is the charge of gas in liquid form. The process of loadin...
Desima Ayuningtyas, 2018, NIT: 51145144. N, “Effort to Prevent High Pressure Tank LPG/C Vessel at L...
Abstraksi – MT. Pertamina Gas 1 merupakan kapal tanker pengangkut muatan LPG tipe Fully Refrigerate...
ABSTRAKSI Mitaningrum, Devi, 2023, 561911117068 N, “Analisis Proses Pemuatan Liquefied Petroleum G...
Muhammad Ilham Fatah Arrozaq, 2017, NIT: 50134820.N, “Optimalization Loading Process of Liquefied Pe...
Abstraksi, kapal VLGC Pertamina Gas 1 adalah kapal gas dengan tipe fully refrigerated yang dirancang...
Arti Kusuma Putri, 2018, NIT: 51145208 N, “Manajemen Pergantian Muatan dari Muatan Butadiene ke LPG...
Ira Sigit Pradikta, 2017, NIT: 49124450.N, "Efforts to Reduce Pressure On Cargo Tank In Ship LPG / ...
Abstraksi - LPG kepanjangan dari Liquefied petroleum gas, LPG berbentuk gas yang dicairkan, terdiri ...
Abstraksi - LPG kepanjangan dari Liquefied petroleum gas, LPG berbentuk gas yang dicairkan, terdiri ...
ABSTRACT Mitha Rahmania Pratiwi, 2018, 5145127.N, “Identification cargo handling of LPG utilized re...
ABSTRACT Bagas Prabowo, 2018, 50134742 N, "The handling of loading and unloading LNG (gas methane ...
Sigit Prasetyo, 2017, Minimize LPG cargo leakage at LPG/C vessel – Attaka when discharge in Langkat,...
Dristian Prayogo, 2016, NIT: 49124475.N, “Fire on ship handling Liquefied Petroleum Gas (LPG) Navig...
Agami, Dhimas Panji Gilang. 2016. Handling Influence Temperature Outside On The Process Loading Liqu...
LPG consists of butane and propane, which is the charge of gas in liquid form. The process of loadin...
Desima Ayuningtyas, 2018, NIT: 51145144. N, “Effort to Prevent High Pressure Tank LPG/C Vessel at L...
Abstraksi – MT. Pertamina Gas 1 merupakan kapal tanker pengangkut muatan LPG tipe Fully Refrigerate...
ABSTRAKSI Mitaningrum, Devi, 2023, 561911117068 N, “Analisis Proses Pemuatan Liquefied Petroleum G...