To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests were carried out on a 55 year old five-span bridge with a length of 121 m in Kiruna in northern Sweden. Both non-destructive and destructive full-scale tests were performed. This paper presents results regarding methods for assessment of the structural capacity of concrete bridges
Three Swedish concrete bridges have been tested to failure and the results have been compared to ass...
The demolition of an old structure and replacement with a new one is a very complex, time consuming ...
In order to provide relevant data for calibration and development of methods for assessment ofexisti...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests were carri...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests were carri...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests areplanned...
In this paper, experiences on the development of an assessment method for existing bridges are prese...
Results are presented from the testing to failure of a 55-year-old prestressed concrete bridge with ...
Optimising the strategy for repairing, upgrading and replacing bridges in the European Union, and el...
Three Swedish concrete bridges have been tested to failure and the results have been compared to ass...
The demolition of an old structure and replacement with a new one is a very complex, time consuming ...
In order to provide relevant data for calibration and development of methods for assessment ofexisti...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests were carri...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests were carri...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests areplanned...
In this paper, experiences on the development of an assessment method for existing bridges are prese...
Results are presented from the testing to failure of a 55-year-old prestressed concrete bridge with ...
Optimising the strategy for repairing, upgrading and replacing bridges in the European Union, and el...
Three Swedish concrete bridges have been tested to failure and the results have been compared to ass...
The demolition of an old structure and replacement with a new one is a very complex, time consuming ...
In order to provide relevant data for calibration and development of methods for assessment ofexisti...