Optimising the strategy for repairing, upgrading and replacing bridges in the European Union, and elsewhere, is becoming increasingly important due to ageing of the bridge stock, continuously increasing load requirements and budgetary limitations. Thus, there is a clear need to identify or develop, and implement, refined methods for assessing existing bridges in order to determine the most cost-effective options and actions to extend their lives, increase their capacities or replace them.Thus, the objective of the research project partly reported in this licentiate thesis is to verify and calibrate methods for refined assessment of existing bridges, using information acquired in an extensive program of experimental studies. In addition to d...
A finite element (FE) model was calibrated using the data obtained from a full-scale test to failure...
Results are presented from the testing to failure of a 55-year-old prestressed concrete bridge with ...
In this project, enhanced methods of analysis were used to demonstrate how higher load carrying capa...
Optimising the strategy for repairing, upgrading and replacing bridges in the European Union, and el...
To meet new demands, existing bridges might be in need for repair, upgrading or replacement. To assi...
Assessing existing bridges is an important task in the sustainable management ofinfrastructure. In p...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests are planne...
A reinforced concrete railway trough bridge has been strengthened and loaded to failure. The aim was...
There are many beautiful old structures around the world, some of which were designed for completely...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests were carri...
The demolition of an old structure and replacement with a new one is a very complex, time consuming ...
A finite element (FE) model was calibrated using the data obtained from a full-scale test to failure...
Results are presented from the testing to failure of a 55-year-old prestressed concrete bridge with ...
In this project, enhanced methods of analysis were used to demonstrate how higher load carrying capa...
Optimising the strategy for repairing, upgrading and replacing bridges in the European Union, and el...
To meet new demands, existing bridges might be in need for repair, upgrading or replacement. To assi...
Assessing existing bridges is an important task in the sustainable management ofinfrastructure. In p...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests are planne...
A reinforced concrete railway trough bridge has been strengthened and loaded to failure. The aim was...
There are many beautiful old structures around the world, some of which were designed for completely...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests were carri...
The demolition of an old structure and replacement with a new one is a very complex, time consuming ...
A finite element (FE) model was calibrated using the data obtained from a full-scale test to failure...
Results are presented from the testing to failure of a 55-year-old prestressed concrete bridge with ...
In this project, enhanced methods of analysis were used to demonstrate how higher load carrying capa...