Existing engineering problems in Mosul Dam and their background are discussed in this paper. A thorough review of the available geological reports was made. These reports covered many decades of investigations from 1953 up to the investigations performed during the construction of the dam. A large volume of geological information was accumulated during these investigations, but it is unfortunate to see that some of the basic facts were not interpreted correctly. This applies to the incorrect correlation of the encountered beds in the exploration boreholes and miss-understanding of the actual stratigraphic succession at the dam site. This misinterpretation contributed to misleading results regarding the true karst zones and the type of rocks...