Railways are large linear assets of electrical and mechanical systems, and consequently the infrastructure managers (IMs) are extensive with many stakeholder involved. The railway infrastructure and the IMs consist of technical and organisational levels: system, subsystem and component levels, and strategic, tactical and operational levels, respectively. The purpose of this project is to develop a methodology for improving performance measurement systems for railway infrastructure, which integrates both the technical and organisational perspectives, vertically and laterally. It involves several objectives, hundreds of parameters and indicators, data collection, and aggregation of information.The work that has been carried out is as under:• ...