© 2018, Springer International Publishing AG. When performing equipment selection, we can best account for the operating cost by considering the utilised hours of the equipment. In a surface mine, equipment is often not utilised to full capacity and not accounting for this difference may lead to inferior solutions. In operations such as this, the cost of operating equipment depends on the age of the equipment while the utilisation of equipment is usually based on the equipment cost. The co-dependency of the age of the equipment and the utilisation has provided a barrier to tractable equipment selection models. That is, equipment is rarely utilised in a uniform way, causing the ageing of the equipment (when considering the total hours utilis...
© 2018, Springer International Publishing AG. Our aim is to develop effective computational models f...
Methods for estimating productivity and costs, and dependent equipment selection process, have neede...
This paper proposes a new multi-resource multi-stage mine production timetabling problem for optimis...
© 2018, Springer International Publishing AG. When performing equipment selection, we can best accou...
© 2018, Springer International Publishing AG. In a simple surface mining scenario we can consider th...
In the surface mining industry the equipment selection problem involves choosing a fleet of trucks a...
In a simple surface mining scenario we consider a mine to have one mining location and dumpsite conn...
© 2018, Springer International Publishing AG. In this chapter we consider a multi-location mining op...
© 2018, Springer International Publishing AG. The viability of todays mining industry is very highly...
© 2018, Springer International Publishing AG. This chapter presents the basic concepts that are need...
© 2018, Springer International Publishing AG. In this chapter, we present a detailed literature revi...
One of the challenging problems for surface mining operation optimization is choosing the optimal tr...
Mining investment has been recognized as capital intensive due mainly to the cost of large equipment...
Mining is a capital-intensive industry that requires hundreds of million-dollar investment in major ...
Open pit mining operations utilize large scale and expensive equipment. For the mines implementing s...
© 2018, Springer International Publishing AG. Our aim is to develop effective computational models f...
Methods for estimating productivity and costs, and dependent equipment selection process, have neede...
This paper proposes a new multi-resource multi-stage mine production timetabling problem for optimis...
© 2018, Springer International Publishing AG. When performing equipment selection, we can best accou...
© 2018, Springer International Publishing AG. In a simple surface mining scenario we can consider th...
In the surface mining industry the equipment selection problem involves choosing a fleet of trucks a...
In a simple surface mining scenario we consider a mine to have one mining location and dumpsite conn...
© 2018, Springer International Publishing AG. In this chapter we consider a multi-location mining op...
© 2018, Springer International Publishing AG. The viability of todays mining industry is very highly...
© 2018, Springer International Publishing AG. This chapter presents the basic concepts that are need...
© 2018, Springer International Publishing AG. In this chapter, we present a detailed literature revi...
One of the challenging problems for surface mining operation optimization is choosing the optimal tr...
Mining investment has been recognized as capital intensive due mainly to the cost of large equipment...
Mining is a capital-intensive industry that requires hundreds of million-dollar investment in major ...
Open pit mining operations utilize large scale and expensive equipment. For the mines implementing s...
© 2018, Springer International Publishing AG. Our aim is to develop effective computational models f...
Methods for estimating productivity and costs, and dependent equipment selection process, have neede...
This paper proposes a new multi-resource multi-stage mine production timetabling problem for optimis...