Generating short- and long-term mine production schedules in isolation and independently from each other means that only a local optimum can be achieved when each scheduling phase is carried out. The globally optimal solution however, can be achieved when integrating scheduling phases and accounting for the interaction between short-term and long-term activities simultaneously. This paper addresses the task of integrating short- and long-term production plans by combining the short-term objective of minimising deviation to targeted mill feed grade with the long-term objective of maximising net present value (NPV) into a single mathematical model. A case study is presented which compares the present values of the same stope data set schedule...
In the context of a case study for an underground gold mine, the value generated by a schedule optim...
Mixed integer programming (MIP) has been used for optimizing production schedules of mines since the...
We consider the multiple time period short-term production scheduling problem for a network of multi...
The development of short- and medium-term mine production schedules in isolation from each other has...
Tactical mine planning is the process of determining the sequence and schedule of activities that wi...
Maximising value is the main objective when developing long term mine production schedules. These re...
Optimisation techniques for underground metalliferous mine design and planning are not commonplace l...
The mining industry is increasingly oriented towards large scale mining and the planning concept of ...
Abstract LKAB’s Kiruna mine is an underground sublevel caving mine located above the Arctic circle i...
Mining companies desire short-term mine planning optimization since this enables them to schedule ma...
none3siLong-term production scheduling is a major step in open pit mine planning and design. It aims...
One of the most important aspects in the long-term planning of an underground mine is the decision o...
It is common practice for underground mine plans to be created sequentially, where results from one ...
An integrated approach for short-tenn production planning and equipment dispatching for underground ...
We present a methodology for long-term mine planning based on a general capacitated multicommodity n...
In the context of a case study for an underground gold mine, the value generated by a schedule optim...
Mixed integer programming (MIP) has been used for optimizing production schedules of mines since the...
We consider the multiple time period short-term production scheduling problem for a network of multi...
The development of short- and medium-term mine production schedules in isolation from each other has...
Tactical mine planning is the process of determining the sequence and schedule of activities that wi...
Maximising value is the main objective when developing long term mine production schedules. These re...
Optimisation techniques for underground metalliferous mine design and planning are not commonplace l...
The mining industry is increasingly oriented towards large scale mining and the planning concept of ...
Abstract LKAB’s Kiruna mine is an underground sublevel caving mine located above the Arctic circle i...
Mining companies desire short-term mine planning optimization since this enables them to schedule ma...
none3siLong-term production scheduling is a major step in open pit mine planning and design. It aims...
One of the most important aspects in the long-term planning of an underground mine is the decision o...
It is common practice for underground mine plans to be created sequentially, where results from one ...
An integrated approach for short-tenn production planning and equipment dispatching for underground ...
We present a methodology for long-term mine planning based on a general capacitated multicommodity n...
In the context of a case study for an underground gold mine, the value generated by a schedule optim...
Mixed integer programming (MIP) has been used for optimizing production schedules of mines since the...
We consider the multiple time period short-term production scheduling problem for a network of multi...