Ground improvement is often required in land reclamation projects on soft soil deposits to reduce future settlement under the projected future dead and live loads. In the case of thick deposits of marine clay, it is often necessary to accelerate the consolidation process of the clay using prefabricated vertical drains. In such projects, the degree of improvement has to be ascertained to confirm whether the soil has achieved the required degree of consolidation before the removal of surcharge. This analysis can be carried out by means of observational methods for which the ground behaviour is continuously monitored from the date of instrument installation. This paper provides a case study of the applications of geotechnical instrumentation f...
Since the early 1990’s till early 2000s, the Changi East Reclamation Project in the Republic of Sing...
The use of prefabricated vertical drains with preloading option is the most widely-used ground impro...
The use of prefabricated vertical drains with preloading option is the most widely-used ground impro...
Ground improvement is often required in land reclamation projects on soft soil deposits to reduce fu...
The Changi East Reclamation Project in the Republic of Singapore necessitated offshore land reclamat...
The Changi East Reclamation Project in Singapore necessitated land reclamation of the foreshore for ...
In land reclamation on marine clay formations, ground improvement works is often necessary to be car...
The Changi East Reclamation projects in Singapore were implemented in five phases starting from 1991...
The Changi East Reclamation Project in the Republic of Singapore comprises the ground improvement of...
The ongoing Changi East Reclamation Project in Singapore consists of land reclamation and ground imp...
Piezometers are commonly used for monitoring the dissipation of pore water pressure and therefore de...
The Changi East Reclamation Project in the Republic of Singapore involved the filling of approximate...
In ground improvement projects with prefabricated vertical drains, the duration of the preloading pe...
Implementation of mega geotechnical engineering projects requires a systematic approach and detailed...
The Changi East Reclamation Project in the Republic of Singapore comprises of the ground improvement...
Since the early 1990’s till early 2000s, the Changi East Reclamation Project in the Republic of Sing...
The use of prefabricated vertical drains with preloading option is the most widely-used ground impro...
The use of prefabricated vertical drains with preloading option is the most widely-used ground impro...
Ground improvement is often required in land reclamation projects on soft soil deposits to reduce fu...
The Changi East Reclamation Project in the Republic of Singapore necessitated offshore land reclamat...
The Changi East Reclamation Project in Singapore necessitated land reclamation of the foreshore for ...
In land reclamation on marine clay formations, ground improvement works is often necessary to be car...
The Changi East Reclamation projects in Singapore were implemented in five phases starting from 1991...
The Changi East Reclamation Project in the Republic of Singapore comprises the ground improvement of...
The ongoing Changi East Reclamation Project in Singapore consists of land reclamation and ground imp...
Piezometers are commonly used for monitoring the dissipation of pore water pressure and therefore de...
The Changi East Reclamation Project in the Republic of Singapore involved the filling of approximate...
In ground improvement projects with prefabricated vertical drains, the duration of the preloading pe...
Implementation of mega geotechnical engineering projects requires a systematic approach and detailed...
The Changi East Reclamation Project in the Republic of Singapore comprises of the ground improvement...
Since the early 1990’s till early 2000s, the Changi East Reclamation Project in the Republic of Sing...
The use of prefabricated vertical drains with preloading option is the most widely-used ground impro...
The use of prefabricated vertical drains with preloading option is the most widely-used ground impro...