In the 90's, INERIS very quickly came to the conclusion that a fragmented approach to risks using sub-systems was not sufficient to ensure a good level of preparedness of safety and security in underground infrastructures. Based on this consideration, INERIS has developed a full set of research topics that has led to a global risk management approach. In 1990, INERIS developed completely new software known as NewVendis© allowing a global and dynamic simulation of accident risks in underground infrastructures. As a result, since 2000 complete safety assessments of infrastructures have been possible, taking into account ventilation and propagation of smoke, vehicle movements and the behaviour of hazardous sources such as fire and toxic substa...
International audienceSerious accidents, which occurred in France in road tunnels in the 2000’s, hav...
International audienceThis paper presents the current state of French and European practices for roa...
At present time, future alpine railway crossings are under construction that will go through long tu...
In the 90's, INERIS very quickly came to the conclusion that a fragmented approach to risks using su...
Even if the number of events in road tunnels is globally low, several recents events have shown that...
The objective of the EGSISTES (Global Evaluation of Intrinsic Security of Underground Transport Syst...
Following the fire which occurred in March 1999 in the Mont Blanc tunnel located between France and ...
Ground movements induced by underground cavities or rock slopes may lead to tragic consequences. Ris...
In an underground quarry, INERIS (National Institute of Industrial Environment and Risk) has set up ...
AbstractIn 2003, the French Guided Public Transport Safety Decree updated the current transport legi...
The European Directive 2004/54/EC - concerning minimum safety requirements for tunnels on the trans-...
The paper proposes the main results obtained from the Quantitative Risk Analysis developed on an exi...
International audienceSerious accidents, which occurred in road tunnels in the 2000’s, have revealed...
The methodology of risk assessment is commonly implemented in many engineering projects for safety m...
INERIS has been involved for many years in supporting the French public authorities in defining nati...
International audienceSerious accidents, which occurred in France in road tunnels in the 2000’s, hav...
International audienceThis paper presents the current state of French and European practices for roa...
At present time, future alpine railway crossings are under construction that will go through long tu...
In the 90's, INERIS very quickly came to the conclusion that a fragmented approach to risks using su...
Even if the number of events in road tunnels is globally low, several recents events have shown that...
The objective of the EGSISTES (Global Evaluation of Intrinsic Security of Underground Transport Syst...
Following the fire which occurred in March 1999 in the Mont Blanc tunnel located between France and ...
Ground movements induced by underground cavities or rock slopes may lead to tragic consequences. Ris...
In an underground quarry, INERIS (National Institute of Industrial Environment and Risk) has set up ...
AbstractIn 2003, the French Guided Public Transport Safety Decree updated the current transport legi...
The European Directive 2004/54/EC - concerning minimum safety requirements for tunnels on the trans-...
The paper proposes the main results obtained from the Quantitative Risk Analysis developed on an exi...
International audienceSerious accidents, which occurred in road tunnels in the 2000’s, have revealed...
The methodology of risk assessment is commonly implemented in many engineering projects for safety m...
INERIS has been involved for many years in supporting the French public authorities in defining nati...
International audienceSerious accidents, which occurred in France in road tunnels in the 2000’s, hav...
International audienceThis paper presents the current state of French and European practices for roa...
At present time, future alpine railway crossings are under construction that will go through long tu...